Solar power plant, Texas

Taygete Energy Project LLC solar power plant, Texas

Taygete Energy Project LLC is a 255 MW solar power plant in Pecos County, Texas, operated by Taygete Energy Project LLC, and it generated 547,505 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,247th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

255 MWNameplate capacity
25%Capacity factor, 2025, 61st percentile, on 255 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the Taygete Energy Project LLC plant run compared with other solar plants?

The Taygete Energy Project LLC plant had a capacity factor of 25% in 2025 on 255 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Taygete Energy Project LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Taygete Energy Project LLC plant generating more or less than last year?

Generation at Taygete Energy Project LLC rose 21.0% from 2024 to 2025, from 452,518 MWh to 547,505 MWh. Through August 2026 it is running 12.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024452,518
2025547,505
2026 through August327,750
2025, same months373,960
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202661,242
July 202654,176
June 202632,091
May 202648,070
April 202636,762
March 202635,878
February 202630,849
January 202628,682
December 202532,519
November 202539,350
October 202548,276
September 202553,400
August 202563,328
July 202563,637
June 202549,845
May 202555,248
April 202544,757
March 202534,776
February 202535,287
January 202527,082
December 202425,338
November 202428,043
October 202435,182
September 202439,110
August 202448,920
July 202442,555
June 202444,606
May 202452,988
April 202434,462
March 202437,877
February 202432,006
January 202431,431

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Taygete Energy Project LLC plant?

Taygete Energy Project LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 201st largest of 1,023 plants in Texas, the 1,215th largest of 14,327 in the U.S. and the 74th largest of 7,223 solar plants. By 2025 generation it is the 252nd largest of 816 generating plants in the state.

Taygete Energy Project LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)255195,9660.1%
Generation (MWh)547,505592,896,1760.1%
Solar capacity (MW)25530,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Taygete Energy Project LLC plant, and when do they retire?

1 operable generator totals 255 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1255100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic2552021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Taygete Energy Project LLC plant?

TE Taygete Energy HoldCo, LLC is the only joint owner reported for Taygete Energy Project LLC, with 100.0%. Taygete Energy Project LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Taygete Energy Project LLC plant?

Taygete Energy Project LLC is in Coyanosa, Pecos County, Texas, at 31.1652° N, 103.1259° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Taygete Energy Project LLC's 255 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Noble SolarDenton275530,142
Titan Solar ProjectCulberson260579,535
Stampede Solar HybridHopkins256547,282
Taygete Energy Project LLCPecos255547,505
Greasewood SolarPecos255408,300
Texas Solar Nova 1Kent252706,257
RE MaplewoodPecos250526,415

Source: EIA Forms EIA-860 and EIA-923, 2025.