Solar power plant, Texas
Noble Solar power plant, Texas
Noble Solar is a 400 MW power plant, 275 MW of it solar, in Denton County, Texas, operated by Geronimo Power, and it generated 528,067 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 40th percentile of U.S. solar plants. By 2025 generation it ranks 1,285th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Noble Solar plant run compared with other solar plants?
The Noble Solar plant's solar units had a capacity factor of 22% in 2025 on 275 MW of net summer capacity, the 40th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Noble Solar | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Noble Solar plant generating more or less than last year?
Generation at Noble Solar fell 9.5% from 2024 to 2025, from 583,547 MWh to 528,067 MWh. Through August 2026 it is running 10.6% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 583,547 |
| 2025 | 528,067 |
| 2026 through August | 377,310 |
| 2025, same months | 421,840 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 59,628 |
| July 2026 | 66,804 |
| June 2026 | 56,309 |
| May 2026 | 50,896 |
| April 2026 | 39,086 |
| March 2026 | 42,953 |
| February 2026 | 33,473 |
| January 2026 | 28,161 |
| December 2025 | 21,917 |
| November 2025 | 35,613 |
| October 2025 | 46,433 |
| September 2025 | 2,264 |
| August 2025 | 59,360 |
| July 2025 | 70,630 |
| June 2025 | 62,565 |
| May 2025 | 59,889 |
| April 2025 | 45,211 |
| March 2025 | 49,557 |
| February 2025 | 37,723 |
| January 2025 | 36,905 |
| December 2024 | 26,484 |
| November 2024 | 35,666 |
| October 2024 | 53,971 |
| September 2024 | 55,010 |
| August 2024 | 67,702 |
| July 2024 | 63,875 |
| June 2024 | 61,650 |
| May 2024 | 49,964 |
| April 2024 | 47,788 |
| March 2024 | 51,753 |
| February 2024 | 38,801 |
| January 2024 | 30,883 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Noble Solar plant, and when do they retire?
2 operable generators total 400 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 400 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NBSLR | Operating | Solar Photovoltaic | 275 | 2022 | n/a |
| NBSTG | Operating | Batteries | 125 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Noble Solar plant?
EIA lists no joint owners for Noble Solar. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Noble Solar plant use?
Noble Solar has capacity on 2 fuels: 69% solar and 31% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 275 | 68.8% | 530,142 |
| Battery and pumped storage | 125 | 31.3% | -2,075 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Noble Solar plant?
Noble Solar is in Krum, Denton County, Texas, at 33.2615° N, 97.2381° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Noble Solar's 275 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Peregrine Solar | Goliad | 300 | 692,464 |
| Bright Arrow Solar, LLC | Hopkins | 300 | 565,515 |
| Pine Forest Solar I | Hopkins | 300 | 29,755 |
| Noble Solar | Denton | 275 | 530,142 |
| Titan Solar Project | Culberson | 260 | 579,535 |
| Stampede Solar Hybrid | Hopkins | 256 | 547,282 |
| Taygete Energy Project LLC | Pecos | 255 | 547,505 |
Source: EIA Forms EIA-860 and EIA-923, 2025.