Skip to main content
RateWatt

Solar power plant, Texas

Noble Solar power plant, Texas

Noble Solar is a 400 MW power plant, 275 MW of it solar, in Denton County, Texas, operated by Geronimo Power, and it generated 528,067 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 40th percentile of U.S. solar plants. By 2025 generation it ranks 1,285th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

400 MWNameplate capacity
22%Capacity factor, 2025, solar units, 40th percentile, on 275 MW net summer
0.1%Of TX generation, 2025
3 yearsAverage generator age, by MW

How hard does the Noble Solar plant run compared with other solar plants?

The Noble Solar plant's solar units had a capacity factor of 22% in 2025 on 275 MW of net summer capacity, the 40th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Noble Solar22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Noble Solar plant generating more or less than last year?

Generation at Noble Solar fell 9.5% from 2024 to 2025, from 583,547 MWh to 528,067 MWh. Through August 2026 it is running 10.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024583,547
2025528,067
2026 through August377,310
2025, same months421,840
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202659,628
July 202666,804
June 202656,309
May 202650,896
April 202639,086
March 202642,953
February 202633,473
January 202628,161
December 202521,917
November 202535,613
October 202546,433
September 20252,264
August 202559,360
July 202570,630
June 202562,565
May 202559,889
April 202545,211
March 202549,557
February 202537,723
January 202536,905
December 202426,484
November 202435,666
October 202453,971
September 202455,010
August 202467,702
July 202463,875
June 202461,650
May 202449,964
April 202447,788
March 202451,753
February 202438,801
January 202430,883

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Noble Solar plant?

Noble Solar made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 129th largest of 1,023 plants in Texas, the 849th largest of 14,327 in the U.S. and the 63rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 267th largest of 816 generating plants in the state.

Noble Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)400195,9660.2%
Generation (MWh)528,067592,896,1760.1%
Solar capacity (MW)27530,7390.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Noble Solar plant, and when do they retire?

2 operable generators total 400 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2400100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NBSLROperatingSolar Photovoltaic2752022n/a
NBSTGOperatingBatteries1252022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Noble Solar plant?

EIA lists no joint owners for Noble Solar. Geronimo Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Noble Solar plant use?

Noble Solar has capacity on 2 fuels: 69% solar and 31% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar27568.8%530,142
Battery and pumped storage12531.3%-2,075

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Noble Solar plant?

Noble Solar is in Krum, Denton County, Texas, at 33.2615° N, 97.2381° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Noble Solar's 275 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Peregrine SolarGoliad300692,464
Bright Arrow Solar, LLCHopkins300565,515
Pine Forest Solar IHopkins30029,755
Noble SolarDenton275530,142
Titan Solar ProjectCulberson260579,535
Stampede Solar HybridHopkins256547,282
Taygete Energy Project LLCPecos255547,505

Source: EIA Forms EIA-860 and EIA-923, 2025.