Solar power plant, Texas

Peregrine Solar power plant, Texas

Peregrine Solar is a 300 MW solar power plant in Goliad County, Texas, operated by RWE Clean Energy, and it generated 692,464 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,002nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

300 MWNameplate capacity
26%Capacity factor, 2025, 73rd percentile, on 300 MW net summer
0.1%Of TX generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Peregrine Solar plant run compared with other solar plants?

The Peregrine Solar plant had a capacity factor of 26% in 2025 on 300 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Peregrine Solar26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Peregrine Solar plant generating more or less than last year?

Peregrine Solar generated 692,464 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025692,464
2026 through August498,859
2025, same months471,418
Monthly generation, Jan 2025 to Aug 2026
MonthMWh
August 202686,199
July 202678,826
June 202668,719
May 202667,421
April 202644,815
March 202665,219
February 202646,543
January 202641,117
December 202536,717
November 202547,789
October 202564,688
September 202571,852
August 202577,719
July 202571,571
June 202574,133
May 202571,769
April 202554,478
March 202556,598
February 202535,483
January 202529,667

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Peregrine Solar plant?

Peregrine Solar made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 165th largest of 1,023 plants in Texas, the 1,045th largest of 14,327 in the U.S. and the 50th largest of 7,223 solar plants. By 2025 generation it is the 186th largest of 816 generating plants in the state.

Peregrine Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)300195,9660.2%
Generation (MWh)692,464592,896,1760.1%
Solar capacity (MW)30030,7391.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Peregrine Solar plant, and when do they retire?

1 operable generator totals 300 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1300100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PSPVOperatingSolar Photovoltaic3002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Peregrine Solar plant?

EIA lists no joint owners for Peregrine Solar. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Peregrine Solar plant?

Peregrine Solar is in Gollad, Goliad County, Texas, at 28.4279° N, 97.4544° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Peregrine Solar's 300 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Juno Solar ProjectBorden306766,600
Prospero SolarAndrews300759,356
Delilah Solar Energy LLCRed River300557,763
Peregrine SolarGoliad300692,464
Bright Arrow Solar, LLCHopkins300565,515
Pine Forest Solar IHopkins30029,755
Noble SolarDenton275530,142

Source: EIA Forms EIA-860 and EIA-923, 2025.