Solar power plant, Texas
Peregrine Solar power plant, Texas
Peregrine Solar is a 300 MW solar power plant in Goliad County, Texas, operated by RWE Clean Energy, and it generated 692,464 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,002nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Peregrine Solar plant run compared with other solar plants?
The Peregrine Solar plant had a capacity factor of 26% in 2025 on 300 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Peregrine Solar | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Peregrine Solar plant generating more or less than last year?
Peregrine Solar generated 692,464 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 692,464 |
| 2026 through August | 498,859 |
| 2025, same months | 471,418 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 86,199 |
| July 2026 | 78,826 |
| June 2026 | 68,719 |
| May 2026 | 67,421 |
| April 2026 | 44,815 |
| March 2026 | 65,219 |
| February 2026 | 46,543 |
| January 2026 | 41,117 |
| December 2025 | 36,717 |
| November 2025 | 47,789 |
| October 2025 | 64,688 |
| September 2025 | 71,852 |
| August 2025 | 77,719 |
| July 2025 | 71,571 |
| June 2025 | 74,133 |
| May 2025 | 71,769 |
| April 2025 | 54,478 |
| March 2025 | 56,598 |
| February 2025 | 35,483 |
| January 2025 | 29,667 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Peregrine Solar plant, and when do they retire?
1 operable generator totals 300 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 300 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PSPV | Operating | Solar Photovoltaic | 300 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Peregrine Solar plant?
EIA lists no joint owners for Peregrine Solar. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Peregrine Solar plant?
Peregrine Solar is in Gollad, Goliad County, Texas, at 28.4279° N, 97.4544° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Peregrine Solar's 300 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Juno Solar Project | Borden | 306 | 766,600 |
| Prospero Solar | Andrews | 300 | 759,356 |
| Delilah Solar Energy LLC | Red River | 300 | 557,763 |
| Peregrine Solar | Goliad | 300 | 692,464 |
| Bright Arrow Solar, LLC | Hopkins | 300 | 565,515 |
| Pine Forest Solar I | Hopkins | 300 | 29,755 |
| Noble Solar | Denton | 275 | 530,142 |
Source: EIA Forms EIA-860 and EIA-923, 2025.