Juno Solar Project, Texas

Juno Solar Project is a 306 MW solar power plant in Borden County, Texas, operated by SE Juno, LLC, and it generated 766,600 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 917th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

306 MWNameplate capacity
29%Capacity factor, 2025, 85th percentile, on 306 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the Juno Solar Project plant run compared with other solar plants?

The Juno Solar Project plant had a capacity factor of 29% in 2025 on 306 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Juno Solar Project29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Juno Solar Project plant generating more or less than last year?

Generation at Juno Solar Project fell 3.5% from 2024 to 2025, from 794,712 MWh to 766,600 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024794,712
2025766,600
2026 through August528,839
2025, same months543,623
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202691,248
July 202689,340
June 202670,437
May 202670,807
April 202657,416
March 202655,699
February 202651,828
January 202642,064
December 202542,230
November 202547,291
October 202563,200
September 202570,256
August 202583,759
July 202580,701
June 202585,735
May 202584,163
April 202565,188
March 202544,717
February 202552,593
January 202546,767
December 202443,770
November 202446,804
October 202463,339
September 202474,390
August 202491,410
July 202492,019
June 202485,271
May 202480,464
April 202451,842
March 202464,901
February 202455,010
January 202445,492

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Juno Solar Project plant?

Juno Solar Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. By capacity it is the 157th largest of 1,023 plants in Texas, the 1,018th largest of 14,327 in the U.S. and the 39th largest of 7,223 solar plants. By 2025 generation it is the 164th largest of 816 generating plants in the state.

Juno Solar Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)306195,9660.2%
Generation (MWh)766,600592,896,1760.1%
Solar capacity (MW)30630,7391.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Juno Solar Project plant, and when do they retire?

2 operable generators total 306 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2306100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
IPJNOOperatingSolar Photovoltaic1442021n/a
JUNO1OperatingSolar Photovoltaic1622021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Juno Solar Project plant?

EIA lists no joint owners for Juno Solar Project. SE Juno, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Juno Solar Project plant?

Juno Solar Project is in Lamesa, Borden County, Texas, at 32.7729° N, 101.3910° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Juno Solar Project's 306 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Delilah Solar Energy II LLCRed River310558,764
BT Hickerson Solar, LLCBosque310205,489
Greasewood II LLCPecos306796,894
Juno Solar ProjectBorden306766,600
Prospero SolarAndrews300759,356
Delilah Solar Energy LLCRed River300557,763
Peregrine SolarGoliad300692,464