Solar power plant, Texas
Juno Solar Project, Texas
Juno Solar Project is a 306 MW solar power plant in Borden County, Texas, operated by SE Juno, LLC, and it generated 766,600 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 917th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Juno Solar Project plant run compared with other solar plants?
The Juno Solar Project plant had a capacity factor of 29% in 2025 on 306 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Juno Solar Project | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Juno Solar Project plant generating more or less than last year?
Generation at Juno Solar Project fell 3.5% from 2024 to 2025, from 794,712 MWh to 766,600 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 794,712 |
| 2025 | 766,600 |
| 2026 through August | 528,839 |
| 2025, same months | 543,623 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 91,248 |
| July 2026 | 89,340 |
| June 2026 | 70,437 |
| May 2026 | 70,807 |
| April 2026 | 57,416 |
| March 2026 | 55,699 |
| February 2026 | 51,828 |
| January 2026 | 42,064 |
| December 2025 | 42,230 |
| November 2025 | 47,291 |
| October 2025 | 63,200 |
| September 2025 | 70,256 |
| August 2025 | 83,759 |
| July 2025 | 80,701 |
| June 2025 | 85,735 |
| May 2025 | 84,163 |
| April 2025 | 65,188 |
| March 2025 | 44,717 |
| February 2025 | 52,593 |
| January 2025 | 46,767 |
| December 2024 | 43,770 |
| November 2024 | 46,804 |
| October 2024 | 63,339 |
| September 2024 | 74,390 |
| August 2024 | 91,410 |
| July 2024 | 92,019 |
| June 2024 | 85,271 |
| May 2024 | 80,464 |
| April 2024 | 51,842 |
| March 2024 | 64,901 |
| February 2024 | 55,010 |
| January 2024 | 45,492 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Juno Solar Project plant, and when do they retire?
2 operable generators total 306 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 306 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| IPJNO | Operating | Solar Photovoltaic | 144 | 2021 | n/a |
| JUNO1 | Operating | Solar Photovoltaic | 162 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Juno Solar Project plant?
EIA lists no joint owners for Juno Solar Project. SE Juno, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Juno Solar Project plant?
Juno Solar Project is in Lamesa, Borden County, Texas, at 32.7729° N, 101.3910° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Juno Solar Project's 306 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Delilah Solar Energy II LLC | Red River | 310 | 558,764 |
| BT Hickerson Solar, LLC | Bosque | 310 | 205,489 |
| Greasewood II LLC | Pecos | 306 | 796,894 |
| Juno Solar Project | Borden | 306 | 766,600 |
| Prospero Solar | Andrews | 300 | 759,356 |
| Delilah Solar Energy LLC | Red River | 300 | 557,763 |
| Peregrine Solar | Goliad | 300 | 692,464 |
Source: EIA Forms EIA-860 and EIA-923, 2025.