Solar power plant, Texas

Prospero Solar power plant, Texas

Prospero Solar is a 300 MW solar power plant in Andrews County, Texas, operated by Prospero Energy Project, LLC (Longroad), and it generated 759,356 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 86th percentile of U.S. solar plants. By 2025 generation it ranks 927th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

300 MWNameplate capacity
29%Capacity factor, 2025, 86th percentile, on 300 MW net summer
0.1%Of TX generation, 2025
5 yearsAverage generator age, by MW

How hard does the Prospero Solar plant run compared with other solar plants?

The Prospero Solar plant had a capacity factor of 29% in 2025 on 300 MW of net summer capacity, the 86th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Prospero Solar29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Prospero Solar plant generating more or less than last year?

Generation at Prospero Solar rose 0.9% from 2024 to 2025, from 752,681 MWh to 759,356 MWh. Through August 2026 it is running 13.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024752,681
2025759,356
2026 through August466,545
2025, same months536,173
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202692,195
July 202685,851
June 202655,272
May 202668,330
April 202646,803
March 202642,887
February 202638,824
January 202636,383
December 202541,787
November 202547,365
October 202561,793
September 202572,238
August 202582,837
July 202583,851
June 202571,256
May 202580,378
April 202571,210
March 202551,499
February 202550,481
January 202544,661
December 202443,414
November 202445,395
October 202461,655
September 202471,610
August 202487,868
July 202483,362
June 202480,888
May 202477,560
April 202454,786
March 202455,929
February 202447,180
January 202443,034

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Prospero Solar plant?

Prospero Solar made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. By capacity it is the 165th largest of 1,023 plants in Texas, the 1,045th largest of 14,327 in the U.S. and the 43rd largest of 7,223 solar plants. By 2025 generation it is the 168th largest of 816 generating plants in the state.

Prospero Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)300195,9660.2%
Generation (MWh)759,356592,896,1760.1%
Solar capacity (MW)30030,7391.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Prospero Solar plant, and when do they retire?

1 operable generator totals 300 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1300100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PROSPOperatingSolar Photovoltaic3002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Prospero Solar plant?

EIA lists no joint owners for Prospero Solar. Prospero Energy Project, LLC (Longroad) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Prospero Solar plant?

Prospero Solar is in Andrews, Andrews County, Texas, at 32.2879° N, 102.8404° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Prospero Solar's 300 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
BT Hickerson Solar, LLCBosque310205,489
Greasewood II LLCPecos306796,894
Juno Solar ProjectBorden306766,600
Prospero SolarAndrews300759,356
Delilah Solar Energy LLCRed River300557,763
Peregrine SolarGoliad300692,464
Bright Arrow Solar, LLCHopkins300565,515

Source: EIA Forms EIA-860 and EIA-923, 2025.