Solar power plant, Texas
Pine Forest Solar I power plant, Texas
Pine Forest Solar I is a 500 MW power plant, 300 MW of it solar, in Hopkins County, Texas, operated by Pine Forest Solar I, LLC, and it generated 29,475 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. solar plants. By 2025 generation it ranks 4,772nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pine Forest Solar I plant run compared with other solar plants?
The Pine Forest Solar I plant's solar units had a capacity factor of 1% in 2025 on 300 MW of net summer capacity, the 2nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 4 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pine Forest Solar I | 1% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Pine Forest Solar I plant generating more or less than last year?
Pine Forest Solar I generated 29,475 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 29,475 |
| 2026 through August | 436,114 |
Monthly generation, Oct 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 77,721 |
| July 2026 | 75,713 |
| June 2026 | 61,092 |
| May 2026 | 60,866 |
| April 2026 | 40,718 |
| March 2026 | 49,890 |
| February 2026 | 40,716 |
| January 2026 | 29,398 |
| December 2025 | 29,475 |
| November 2025 | 0 |
| October 2025 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pine Forest Solar I plant, and when do they retire?
2 operable generators total 500 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 200 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 500 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PFBA | Operating | Batteries | 200 | 2025 | n/a |
| PFPV | Operating | Solar Photovoltaic | 300 | 2025 | n/a |
| PFBA2 | Under construction, under half built | Batteries | 200 | 2027 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pine Forest Solar I plant?
EIA lists no joint owners for Pine Forest Solar I. Pine Forest Solar I, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Pine Forest Solar I plant use?
Pine Forest Solar I has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 300 | 60.0% | 29,755 |
| Battery and pumped storage | 200 | 40.0% | -280 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Pine Forest Solar I plant?
Pine Forest Solar I is in Pickton, Hopkins County, Texas, at 33.1008° N, 95.3923° W. It sits in the PUD No. 1 of Douglas County balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Pine Forest Solar I's 300 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Delilah Solar Energy LLC | Red River | 300 | 557,763 |
| Peregrine Solar | Goliad | 300 | 692,464 |
| Bright Arrow Solar, LLC | Hopkins | 300 | 565,515 |
| Pine Forest Solar I | Hopkins | 300 | 29,755 |
| Noble Solar | Denton | 275 | 530,142 |
| Titan Solar Project | Culberson | 260 | 579,535 |
| Stampede Solar Hybrid | Hopkins | 256 | 547,282 |
Source: EIA Forms EIA-860 and EIA-923, 2025.