Solar power plant, Texas

Pine Forest Solar I power plant, Texas

Pine Forest Solar I is a 500 MW power plant, 300 MW of it solar, in Hopkins County, Texas, operated by Pine Forest Solar I, LLC, and it generated 29,475 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. solar plants. By 2025 generation it ranks 4,772nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

500 MWNameplate capacity
1%Capacity factor, 2025, solar units, 2nd percentile, on 300 MW net summer
4,772ndU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Pine Forest Solar I plant run compared with other solar plants?

The Pine Forest Solar I plant's solar units had a capacity factor of 1% in 2025 on 300 MW of net summer capacity, the 2nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 4 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pine Forest Solar I1%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Pine Forest Solar I plant generating more or less than last year?

Pine Forest Solar I generated 29,475 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
202529,475
2026 through August436,114
Monthly generation, Oct 2025 to Aug 2026
MonthMWh
August 202677,721
July 202675,713
June 202661,092
May 202660,866
April 202640,718
March 202649,890
February 202640,716
January 202629,398
December 202529,475
November 20250
October 20250

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Pine Forest Solar I plant?

Pine Forest Solar I made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 94th largest of 1,023 plants in Texas, the 733rd largest of 14,327 in the U.S. and the 58th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 557th largest of 816 generating plants in the state.

Pine Forest Solar I within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)500195,9660.3%
Generation (MWh)29,475592,896,1760.0%
Solar capacity (MW)30030,7391.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pine Forest Solar I plant, and when do they retire?

2 operable generators total 500 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 200 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2500100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PFBAOperatingBatteries2002025n/a
PFPVOperatingSolar Photovoltaic3002025n/a
PFBA2Under construction, under half builtBatteries2002027n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pine Forest Solar I plant?

EIA lists no joint owners for Pine Forest Solar I. Pine Forest Solar I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Pine Forest Solar I plant use?

Pine Forest Solar I has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30060.0%29,755
Battery and pumped storage20040.0%-280

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Pine Forest Solar I plant?

Pine Forest Solar I is in Pickton, Hopkins County, Texas, at 33.1008° N, 95.3923° W. It sits in the PUD No. 1 of Douglas County balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Pine Forest Solar I's 300 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Delilah Solar Energy LLCRed River300557,763
Peregrine SolarGoliad300692,464
Bright Arrow Solar, LLCHopkins300565,515
Pine Forest Solar IHopkins30029,755
Noble SolarDenton275530,142
Titan Solar ProjectCulberson260579,535
Stampede Solar HybridHopkins256547,282

Source: EIA Forms EIA-860 and EIA-923, 2025.