Solar power plant, Texas
Stampede Solar Hybrid power plant, Texas
Stampede Solar Hybrid is a 328 MW power plant, 256 MW of it solar, in Hopkins County, Texas, operated by Stampede Solar Project LLC, and it generated 540,781 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 1,266th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Stampede Solar Hybrid plant run compared with other solar plants?
The Stampede Solar Hybrid plant's solar units had a capacity factor of 24% in 2025 on 256 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Stampede Solar Hybrid | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Stampede Solar Hybrid plant generating more or less than last year?
Stampede Solar Hybrid generated 540,781 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.7% behind the same months of 2025. 2024 has output for only 3 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 113,545 |
| 2025 | 540,781 |
| 2026 through August | 373,863 |
| 2025, same months | 380,469 |
Monthly generation, Oct 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 65,553 |
| July 2026 | 65,253 |
| June 2026 | 51,028 |
| May 2026 | 54,414 |
| April 2026 | 38,268 |
| March 2026 | 40,603 |
| February 2026 | 30,504 |
| January 2026 | 28,240 |
| December 2025 | 24,914 |
| November 2025 | 33,298 |
| October 2025 | 47,004 |
| September 2025 | 55,096 |
| August 2025 | 61,386 |
| July 2025 | 66,883 |
| June 2025 | 58,530 |
| May 2025 | 51,413 |
| April 2025 | 34,246 |
| March 2025 | 41,704 |
| February 2025 | 32,466 |
| January 2025 | 33,841 |
| December 2024 | 25,316 |
| November 2024 | 33,119 |
| October 2024 | 55,110 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Stampede Solar Hybrid plant, and when do they retire?
2 operable generators total 328 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 328 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| STMPB | Operating | Batteries | 72 | 2024 | n/a |
| STMPS | Operating | Solar Photovoltaic | 256 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Stampede Solar Hybrid plant?
EIA lists no joint owners for Stampede Solar Hybrid. Stampede Solar Project LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Stampede Solar Hybrid plant use?
Stampede Solar Hybrid has capacity on 2 fuels: 78% solar and 22% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 256 | 78.0% | 547,282 |
| Battery and pumped storage | 72 | 22.0% | -6,501 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Stampede Solar Hybrid plant?
Stampede Solar Hybrid is in Saltillo, Hopkins County, Texas, at 33.2013° N, 95.3192° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Stampede Solar Hybrid's 256 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pine Forest Solar I | Hopkins | 300 | 29,755 |
| Noble Solar | Denton | 275 | 530,142 |
| Titan Solar Project | Culberson | 260 | 579,535 |
| Stampede Solar Hybrid | Hopkins | 256 | 547,282 |
| Taygete Energy Project LLC | Pecos | 255 | 547,505 |
| Greasewood Solar | Pecos | 255 | 408,300 |
| Texas Solar Nova 1 | Kent | 252 | 706,257 |
Source: EIA Forms EIA-860 and EIA-923, 2025.