Solar power plant, Texas

Stampede Solar Hybrid power plant, Texas

Stampede Solar Hybrid is a 328 MW power plant, 256 MW of it solar, in Hopkins County, Texas, operated by Stampede Solar Project LLC, and it generated 540,781 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 1,266th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

328 MWNameplate capacity
24%Capacity factor, 2025, solar units, 60th percentile, on 256 MW net summer
0.1%Of TX generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Stampede Solar Hybrid plant run compared with other solar plants?

The Stampede Solar Hybrid plant's solar units had a capacity factor of 24% in 2025 on 256 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Stampede Solar Hybrid24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Stampede Solar Hybrid plant generating more or less than last year?

Stampede Solar Hybrid generated 540,781 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.7% behind the same months of 2025. 2024 has output for only 3 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024113,545
2025540,781
2026 through August373,863
2025, same months380,469
Monthly generation, Oct 2024 to Aug 2026
MonthMWh
August 202665,553
July 202665,253
June 202651,028
May 202654,414
April 202638,268
March 202640,603
February 202630,504
January 202628,240
December 202524,914
November 202533,298
October 202547,004
September 202555,096
August 202561,386
July 202566,883
June 202558,530
May 202551,413
April 202534,246
March 202541,704
February 202532,466
January 202533,841
December 202425,316
November 202433,119
October 202455,110

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Stampede Solar Hybrid plant?

Stampede Solar Hybrid made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 145th largest of 1,023 plants in Texas, the 967th largest of 14,327 in the U.S. and the 72nd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 261st largest of 816 generating plants in the state.

Stampede Solar Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)328195,9660.2%
Generation (MWh)540,781592,896,1760.1%
Solar capacity (MW)25630,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Stampede Solar Hybrid plant, and when do they retire?

2 operable generators total 328 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2328100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
STMPBOperatingBatteries722024n/a
STMPSOperatingSolar Photovoltaic2562025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Stampede Solar Hybrid plant?

EIA lists no joint owners for Stampede Solar Hybrid. Stampede Solar Project LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Stampede Solar Hybrid plant use?

Stampede Solar Hybrid has capacity on 2 fuels: 78% solar and 22% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar25678.0%547,282
Battery and pumped storage7222.0%-6,501

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Stampede Solar Hybrid plant?

Stampede Solar Hybrid is in Saltillo, Hopkins County, Texas, at 33.2013° N, 95.3192° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Stampede Solar Hybrid's 256 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Pine Forest Solar IHopkins30029,755
Noble SolarDenton275530,142
Titan Solar ProjectCulberson260579,535
Stampede Solar HybridHopkins256547,282
Taygete Energy Project LLCPecos255547,505
Greasewood SolarPecos255408,300
Texas Solar Nova 1Kent252706,257

Source: EIA Forms EIA-860 and EIA-923, 2025.