Solar power plant, Texas
Sparta Solar power plant, Texas
Sparta Solar is a 250 MW solar power plant in Bee County, Texas, operated by Sparta Solar, LLC, and it generated 454,439 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 31st percentile of U.S. solar plants. By 2025 generation it ranks 1,442nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sparta Solar plant run compared with other solar plants?
The Sparta Solar plant had a capacity factor of 21% in 2025 on 250 MW of net summer capacity, the 31st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sparta Solar | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sparta Solar plant generating more or less than last year?
Generation at Sparta Solar fell 11.7% from 2024 to 2025, from 514,667 MWh to 454,439 MWh. Through August 2026 it is running 33.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 514,667 |
| 2025 | 454,439 |
| 2026 through August | 420,350 |
| 2025, same months | 313,949 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 61,386 |
| July 2026 | 63,134 |
| June 2026 | 60,855 |
| May 2026 | 57,017 |
| April 2026 | 37,794 |
| March 2026 | 56,418 |
| February 2026 | 45,193 |
| January 2026 | 38,553 |
| December 2025 | 30,144 |
| November 2025 | 35,864 |
| October 2025 | 37,617 |
| September 2025 | 36,865 |
| August 2025 | 38,649 |
| July 2025 | 33,575 |
| June 2025 | 33,331 |
| May 2025 | 44,340 |
| April 2025 | 50,155 |
| March 2025 | 49,085 |
| February 2025 | 33,490 |
| January 2025 | 31,324 |
| December 2024 | 29,949 |
| November 2024 | 40,837 |
| October 2024 | 53,710 |
| September 2024 | 52,057 |
| August 2024 | 66,427 |
| July 2024 | 57,143 |
| June 2024 | 59,779 |
| May 2024 | 48,664 |
| April 2024 | 41,525 |
| March 2024 | 36,190 |
| February 2024 | 20,670 |
| January 2024 | 7,716 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sparta Solar plant, and when do they retire?
1 operable generator totals 250 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 250 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1111 | Operating | Solar Photovoltaic | 250 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sparta Solar plant?
EIA lists no joint owners for Sparta Solar. Sparta Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sparta Solar plant?
Sparta Solar is in Pawnee, Bee County, Texas, at 28.6553° N, 98.0014° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Sparta Solar's 250 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Phoebe Solar | Winkler | 250 | 557,289 |
| Galloway 1 Solar Farm | Concho | 250 | 551,888 |
| Samson Solar Energy | Franklin | 250 | 346,737 |
| Sparta Solar | Bee | 250 | 454,439 |
| Samson Solar Energy III LLC | Lamar | 250 | 277,992 |
| Prospero Solar II | Andrews | 250 | 667,046 |
| Sun Valley Solar Project | Hill | 250 | 555,652 |
Source: EIA Forms EIA-860 and EIA-923, 2025.