Skip to main content
RateWatt

Coal power plant, Ohio

Orrville coal power plant, Ohio

Orrville is a 84.5 MW power plant, 59.5 MW of it coal, in Wayne County, Ohio, operated by City of Orrville-(OH), and it generated 29,306 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 4,778th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

84.5 MWNameplate capacity
3%Capacity factor, 2025, coal units, on 55.5 MW net summer
4,778thU.S. rank by generation, 2025
59 yearsAverage generator age, by MW

How hard does the Orrville plant run compared with other coal plants?

The Orrville plant's coal units had a capacity factor of 3% in 2025 on 55.5 MW of net summer capacity, below nearly all of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 12 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Orrville3%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.

Is the Orrville plant generating more or less than last year?

Orrville generated 29,306 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 5 months, so the two years are not compared.

Net generation by period
PeriodMWh
202419,594
202529,306
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,512
November 20250
October 20250
September 20251,713
August 20251,073
July 20257,333
June 20254,621
May 20251,562
April 20250
March 2025614
February 20250
January 20259,878
December 20240
November 20240
October 20240
September 20240
August 20244,484
July 20245,338
June 20246,125
May 20240
April 20240
March 2024597
February 20240
January 20243,050

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Orrville plant?

Orrville made 0.0% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.2% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 61st largest of 215 plants in Ohio, the 2,911th largest of 14,327 in the U.S. and the 169th largest of 195 coal plants on its coal units alone. By 2025 generation it is the 74th largest of 187 generating plants in the state.

Orrville within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)8534,3920.2%
Generation (MWh)29,306145,060,4990.0%
Coal capacity (MW)606,8220.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Orrville plant, and when do they retire?

5 operable generators total 84.5 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1940s156%none reported
1950s189%none reported
1960s12226%none reported
1970s25059%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
7Out of serviceConventional Steam Coal51949n/a
8Out of serviceConventional Steam Coal81955n/a
9OperatingConventional Steam Coal221961n/a
10OperatingConventional Steam Coal251971n/a
11OperatingNatural Gas Steam Turbine251971n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Orrville plant?

EIA lists no joint owners for Orrville. City of Orrville-(OH) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Orrville charge homes?

City of Orrville, the operator of Orrville, had an average residential price of 10.97¢ per kWh and an average bill of $111 a month in 2025, 35% below the Ohio average of 16.90¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Ohio
City of Orrville10.97¢$11135% lower
Ohio average16.90¢$148
U.S. average17.23¢$1512% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Orrville plant use?

Orrville has capacity on 2 fuels: 70% coal and 30% natural gas. In 2025, coal made 54% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Coal6070.4%15,900
Natural gas2529.6%13,406

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Orrville plant?

Orrville is in Orrville, Wayne County, Ohio, at 40.8510° N, 81.7658° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Ohio are similar in size?

Ohio has 7 operable coal plants with 6,822 MW of capacity, and Orrville's 59.5 MW is 1% of that.

Coal plants in Ohio around this size
PlantCountyMW2025 MWh
OrrvilleWayne6015,900
PainesvilleLake54854

Source: EIA Forms EIA-860 and EIA-923, 2025.