Pasquotank is a 20 MW solar power plant in Pasquotank County, North Carolina, operated by Deriva Energy, and it generated 33,980 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 22nd percentile of U.S. solar plants. By 2025 generation it ranks 4,572nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
19%Capacity factor, 2025, 22nd percentile, on 20 MW net summer
4,572ndU.S. rank by generation, 2025
11 yearsAverage generator age, by MW

How hard does the Pasquotank plant run compared with other solar plants?

The Pasquotank plant had a capacity factor of 19% in 2025 on 20 MW of net summer capacity, the 22nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 71 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pasquotank19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pasquotank plant generating more or less than last year?

Generation at Pasquotank rose 7.1% from 2024 to 2025, from 31,728 MWh to 33,980 MWh.

Net generation by period
PeriodMWh
202431,728
202533,980
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,257
November 20252,473
October 20252,729
September 20252,862
August 20253,765
July 20252,105
June 20252,893
May 20254,358
April 20254,450
March 20253,111
February 20253,493
January 2025484
December 20241,371
November 20241,731
October 20242,643
September 20242,100
August 20242,341
July 20243,511
June 20243,820
May 20243,616
April 20243,218
March 20243,038
February 20242,406
January 20241,933

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Pasquotank plant?

Pasquotank made 0.0% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 119th largest of 928 plants in North Carolina, the 4,775th largest of 14,327 in the U.S. and the 1,134th largest of 7,223 solar plants. By 2025 generation it is the 119th largest of 872 generating plants in the state.

Pasquotank within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)2039,9330.1%
Generation (MWh)33,980134,194,4340.0%
Solar capacity (MW)207,0250.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pasquotank plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PASQ1OperatingSolar Photovoltaic202014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pasquotank plant?

Colonial Eagle Solar, LLC is the only joint owner reported for Pasquotank, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Pasquotank plant?

Pasquotank is in Elizabeth City, Pasquotank County, North Carolina, at 36.2647° N, 76.3061° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Pasquotank's 20 MW is 0% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Meadows PV 1Martin2016,404
Grandy PV 1Currituck2024,854
Kelford (Duke)Bertie2040,272
PasquotankPasquotank2033,980
Five Forks SolarWarren2032,687
Vaughn Creek PV1Hertford2036,409
Morgan's CornerPasquotank2028,428