Skip to main content
RateWatt

Hydro power plant, California

Pit 4 hydroelectric power plant, California

Pit 4 is a 103 MW hydro power plant in Shasta County, California, operated by Pacific Gas & Electric Co., and it generated 396,575 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 82nd percentile of U.S. hydro plants. By 2025 generation it ranks 1,599th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

103 MWNameplate capacity
48%Capacity factor, 2025, 82nd percentile, on 95 MW net summer
0.2%Of CA generation, 2025
70 yearsAverage generator age, by MW

How hard does the Pit 4 plant run compared with other hydro plants?

The Pit 4 plant had a capacity factor of 48% in 2025 on 95 MW of net summer capacity, the 82nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 174 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pit 448%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pit 4 plant generating more or less than last year?

Generation at Pit 4 rose 17.1% from 2024 to 2025, from 338,659 MWh to 396,575 MWh. Through August 2026 it is running 20.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024338,659
2025396,575
2026 through August218,990
2025, same months273,704
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,709
July 202621,160
June 202620,534
May 202626,702
April 202629,631
March 202640,613
February 202637,184
January 202620,457
December 202541,415
November 202529,666
October 202527,255
September 202524,535
August 202523,123
July 202524,484
June 202524,221
May 202538,622
April 202556,707
March 202564,501
February 20254,497
January 202537,549
December 202443,890
November 202435,571
October 202421,787
September 202420,937
August 202419,772
July 202420,465
June 202421,107
May 202439,837
April 202458,165
March 202450,614
February 2024264
January 20246,250

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Pit 4 plant?

Pit 4 made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 264th largest of 1,877 plants in California, the 2,528th largest of 14,327 in the U.S. and the 153rd largest of 1,393 hydro plants. By 2025 generation it is the 115th largest of 1,608 generating plants in the state.

Pit 4 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)103107,4330.1%
Generation (MWh)396,575204,542,8980.2%
Hydro capacity (MW)1039,9361.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pit 4 plant, and when do they retire?

2 operable generators total 103 MW, with an average age of 70 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s2103100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric521955n/a
2OperatingConventional Hydroelectric521955n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pit 4 plant?

EIA lists no joint owners for Pit 4. Pacific Gas & Electric Co. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Pacific Gas & Electric Co. charge homes?

Pacific Gas & Electric Co., the operator of Pit 4, had an average residential price of 37.52¢ per kWh and an average bill of $174 a month in 2025, 20% above the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Pacific Gas & Electric Co.37.52¢$17420% higher
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pit 4 plant?

Pit 4 is in Big Bend, Shasta County, California, at 40.9864° N, 121.8494° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Pit 4's 103 MW is 1% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
Big Creek 2AFresno110258,929
Pit 7Shasta110438,712
MoccasinTuolumne104276,555
Pit 4Shasta103396,575
ElectraAmador103291,434
Big Creek 4Madera100365,498
Balch 2Fresno97342,259

Source: EIA Forms EIA-860 and EIA-923, 2025.