Skip to main content
RateWatt

Hydro power plant, California

Pit 7 hydroelectric power plant, California

Pit 7 is a 110 MW hydro power plant in Shasta County, California, operated by Pacific Gas & Electric Co., and it generated 438,712 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 77th percentile of U.S. hydro plants. By 2025 generation it ranks 1,491st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

110 MWNameplate capacity
44%Capacity factor, 2025, 77th percentile, on 113 MW net summer
0.2%Of CA generation, 2025
60 yearsAverage generator age, by MW

How hard does the Pit 7 plant run compared with other hydro plants?

The Pit 7 plant had a capacity factor of 44% in 2025 on 113 MW of net summer capacity, the 77th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 162 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pit 744%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pit 7 plant generating more or less than last year?

Pit 7 generated 438,712 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 22.8% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024293,248
2025438,712
2026 through August245,475
2025, same months317,847
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202623,151
July 202621,946
June 202621,024
May 202628,024
April 202630,507
March 202628,332
February 202638,288
January 202654,203
December 202544,574
November 202527,417
October 202525,523
September 202523,351
August 202522,954
July 202525,431
June 202527,438
May 202538,977
April 202548,286
March 202540,729
February 202561,529
January 202552,503
December 202448,030
November 202433,445
October 202418,771
September 202420,058
August 202420,035
July 20240
June 20240
May 20240
April 202423,595
March 202431,898
February 202454,876
January 202442,540

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Pit 7 plant?

Pit 7 made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 2.1 times its share of capacity. By capacity it is the 253rd largest of 1,877 plants in California, the 2,448th largest of 14,327 in the U.S. and the 139th largest of 1,393 hydro plants. By 2025 generation it is the 98th largest of 1,608 generating plants in the state.

Pit 7 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)110107,4330.1%
Generation (MWh)438,712204,542,8980.2%
Hydro capacity (MW)1109,9361.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pit 7 plant, and when do they retire?

2 operable generators total 110 MW, with an average age of 60 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s2110100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
H1OperatingConventional Hydroelectric581965n/a
H2OperatingConventional Hydroelectric521965n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pit 7 plant?

EIA lists no joint owners for Pit 7. Pacific Gas & Electric Co. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Pacific Gas & Electric Co. charge homes?

Pacific Gas & Electric Co., the operator of Pit 7, had an average residential price of 37.52¢ per kWh and an average bill of $174 a month in 2025, 20% above the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Pacific Gas & Electric Co.37.52¢$17420% higher
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pit 7 plant?

Pit 7 is in Montgomery Creek, Shasta County, California, at 40.8475° N, 121.9908° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Pit 7's 110 MW is 1% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
Caribou 2Plumas118442,304
KeswickShasta117407,363
Big Creek 2AFresno110258,929
Pit 7Shasta110438,712
MoccasinTuolumne104276,555
Pit 4Shasta103396,575
ElectraAmador103291,434

Source: EIA Forms EIA-860 and EIA-923, 2025.