Biomass power plant, Louisiana
Plant 31 Paper Mill biomass power plant, Louisiana
Plant 31 Paper Mill is a 84.2 MW power plant, 45 MW of it biomass, in Ouachita Parish, Louisiana, operated by Graphic Packaging International, and it generated 514,804 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Louisiana, and its capacity factor sits at the 53rd percentile of U.S. biomass plants. By 2025 generation it ranks 1,313th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Plant 31 Paper Mill plant run compared with other biomass plants?
The Plant 31 Paper Mill plant's biomass units had a capacity factor of 49% in 2025 on 45 MW of net summer capacity, the 53rd percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 179 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Plant 31 Paper Mill | 49% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its biomass generators only. Values above 105% are left out of the comparison.
Is the Plant 31 Paper Mill plant generating more or less than last year?
Generation at Plant 31 Paper Mill fell 1.6% from 2024 to 2025, from 522,982 MWh to 514,804 MWh.
| Period | MWh |
|---|---|
| 2024 | 522,982 |
| 2025 | 514,804 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 48,529 |
| November 2025 | 45,462 |
| October 2025 | 37,068 |
| September 2025 | 45,488 |
| August 2025 | 48,297 |
| July 2025 | 48,988 |
| June 2025 | 40,553 |
| May 2025 | 35,308 |
| April 2025 | 32,171 |
| March 2025 | 42,443 |
| February 2025 | 41,444 |
| January 2025 | 49,052 |
| December 2024 | 46,912 |
| November 2024 | 42,936 |
| October 2024 | 41,334 |
| September 2024 | 43,601 |
| August 2024 | 46,047 |
| July 2024 | 47,217 |
| June 2024 | 47,101 |
| May 2024 | 47,151 |
| April 2024 | 34,024 |
| March 2024 | 42,365 |
| February 2024 | 41,782 |
| January 2024 | 42,513 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Plant 31 Paper Mill plant, and when do they retire?
3 operable generators total 84.2 MW, with an average age of 34 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 18 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 1 | 25 | 30% | none reported |
| 1970s | 1 | 20 | 24% | none reported |
| 2010s | 1 | 39 | 47% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN5 | Operating | Wood/Wood Waste Biomass | 25 | 1964 | n/a |
| GEN6 | Operating | Wood/Wood Waste Biomass | 20 | 1977 | n/a |
| GEN7 | Operating | Natural Gas Fired Combustion Turbine | 39 | 2016 | n/a |
| GEN2 | Retired | Natural Gas Steam Turbine | 6 | 1928 | 2011 |
| GEN3 | Retired | Natural Gas Steam Turbine | 6 | 1930 | 2011 |
| GEN4 | Retired | Natural Gas Steam Turbine | 6 | 1948 | 2011 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Plant 31 Paper Mill plant?
EIA lists no joint owners for Plant 31 Paper Mill. Graphic Packaging International operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Plant 31 Paper Mill plant use?
Plant 31 Paper Mill has capacity on 2 fuels: 53% biomass and 47% natural gas. In 2025, biomass made 38% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Biomass | 45 | 53.4% | 193,354 |
| Natural gas | 39 | 46.6% | 321,450 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Plant 31 Paper Mill plant?
Plant 31 Paper Mill is in West Monroe, Ouachita Parish, Louisiana, at 32.4868° N, 92.1496° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Louisiana are similar in size?
Louisiana has 9 operable biomass plants with 487 MW of capacity, and Plant 31 Paper Mill's 45 MW is 9% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| International Paper Red River Mill | Natchitoches | 79 | 73,436 |
| Westrock Hodge (LA) | Jackson | 66 | 315,245 |
| DeRidder Mill | Beauregard | 62 | 333,234 |
| Plant 31 Paper Mill | Ouachita | 45 | 193,354 |
Source: EIA Forms EIA-860 and EIA-923, 2025.