Solar power plant, Iowa

Pleasant Creek Unit 1 solar power plant, Iowa

Pleasant Creek Unit 1 is a 50 MW solar power plant in Linn County, Iowa, operated by Interstate Power and Light Co, and it generated 98,119 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Iowa, and its capacity factor sits at the 45th percentile of U.S. solar plants. By 2025 generation it ranks 3,415th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
22%Capacity factor, 2025, 45th percentile, on 50 MW net summer
0.1%Of IA generation, 2025
1 yearAverage generator age, by MW

How hard does the Pleasant Creek Unit 1 plant run compared with other solar plants?

The Pleasant Creek Unit 1 plant had a capacity factor of 22% in 2025 on 50 MW of net summer capacity, the 45th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pleasant Creek Unit 122%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pleasant Creek Unit 1 plant generating more or less than last year?

Pleasant Creek Unit 1 generated 98,119 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.5% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
202476,182
202598,119
2026 through August72,867
2025, same months74,750
Monthly generation, Mar 2024 to Aug 2026
MonthMWh
August 20269,698
July 202611,955
June 202611,210
May 202612,124
April 20268,962
March 20268,227
February 20266,360
January 20264,331
December 20252,906
November 20254,184
October 20257,064
September 20259,215
August 202511,290
July 202511,357
June 202511,505
May 202511,687
April 20258,852
March 20259,040
February 20256,263
January 20254,756
December 20242,774
November 20243,246
October 20248,207
September 20249,097
August 202410,557
July 202411,182
June 202410,780
May 202411,418
April 20248,921
March 20240

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Pleasant Creek Unit 1 plant?

Pleasant Creek Unit 1 made 0.1% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.2% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 104th largest of 306 plants in Iowa, the 3,754th largest of 14,327 in the U.S. and the 913th largest of 7,223 solar plants. By 2025 generation it is the 96th largest of 283 generating plants in the state.

Pleasant Creek Unit 1 within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)5024,8170.2%
Generation (MWh)98,11974,502,3730.1%
Solar capacity (MW)506967.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pleasant Creek Unit 1 plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pleasant Creek Unit 1 plant?

EIA lists no joint owners for Pleasant Creek Unit 1. Interstate Power and Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Interstate Power and Light Co charge homes?

Interstate Power and Light Co, the operator of Pleasant Creek Unit 1, had an average residential price of 17.77¢ per kWh and an average bill of $131 a month in 2025, 30% above the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Interstate Power and Light Co17.77¢$13130% higher
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pleasant Creek Unit 1 plant?

Pleasant Creek Unit 1 is in Palo, Linn County, Iowa, at 42.1044° N, 91.7826° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Iowa are similar in size?

Iowa has 34 operable solar plants with 696 MW of capacity, and Pleasant Creek Unit 1's 50 MW is 7% of that.

Solar plants in Iowa around this size
PlantCountyMW2025 MWh
Wapello Solar LLCLouisa100206,273
Holliday Creek SolarWebster100209,059
Pleasant Creek Unit 1Linn5098,119
Creston Solar (50 MW)Union5097,004
Arbor Hill SolarAdair2545,121

Source: EIA Forms EIA-860 and EIA-923, 2025.