Pleasant Creek Unit 2 solar power plant, Iowa

Pleasant Creek Unit 2 is a 150 MW solar power plant in Linn County, Iowa, operated by Interstate Power and Light Co, and it generated 273,601 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Iowa, and its capacity factor sits at the 31st percentile of U.S. solar plants. By 2025 generation it ranks 2,094th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
21%Capacity factor, 2025, 31st percentile, on 150 MW net summer
0.4%Of IA generation, 2025
1 yearAverage generator age, by MW

How hard does the Pleasant Creek Unit 2 plant run compared with other solar plants?

The Pleasant Creek Unit 2 plant had a capacity factor of 21% in 2025 on 150 MW of net summer capacity, the 31st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pleasant Creek Unit 221%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pleasant Creek Unit 2 plant generating more or less than last year?

Pleasant Creek Unit 2 generated 273,601 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.3% behind the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
20243,601
2025273,601
2026 through August203,003
2025, same months207,764
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202626,208
July 202635,022
June 202631,283
May 202634,626
April 202623,736
March 202621,361
February 202618,116
January 202612,651
December 20258,603
November 202512,208
October 202519,576
September 202525,450
August 202530,558
July 202530,117
June 202532,223
May 202532,093
April 202525,169
March 202526,237
February 202517,734
January 202513,633
December 20243,601

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Pleasant Creek Unit 2 plant?

Pleasant Creek Unit 2 made 0.4% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.6% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 60th largest of 306 plants in Iowa, the 1,967th largest of 14,327 in the U.S. and the 297th largest of 7,223 solar plants. By 2025 generation it is the 69th largest of 283 generating plants in the state.

Pleasant Creek Unit 2 within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)15024,8170.6%
Generation (MWh)273,60174,502,3730.4%
Solar capacity (MW)15069621.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pleasant Creek Unit 2 plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic1502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pleasant Creek Unit 2 plant?

EIA lists no joint owners for Pleasant Creek Unit 2. Interstate Power and Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Interstate Power and Light Co charge homes?

Interstate Power and Light Co, the operator of Pleasant Creek Unit 2, had an average residential price of 17.77¢ per kWh and an average bill of $131 a month in 2025, 30% above the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Interstate Power and Light Co17.77¢$13130% higher
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pleasant Creek Unit 2 plant?

Pleasant Creek Unit 2 is in Palo, Linn County, Iowa, at 42.1044° N, 91.7826° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Iowa are similar in size?

Iowa has 34 operable solar plants with 696 MW of capacity, and Pleasant Creek Unit 2's 150 MW is 22% of that.

Solar plants in Iowa around this size
PlantCountyMW2025 MWh
Pleasant Creek Unit 2Linn150273,601
Wever Solar (150MW)Lee150260,475
Wapello Solar LLCLouisa100206,273
Holliday Creek SolarWebster100209,059

Source: EIA Forms EIA-860 and EIA-923, 2025.