Skip to main content
RateWatt

Hydro power plant, California

Poe hydroelectric power plant, California

Poe is a 143 MW hydro power plant in Butte County, California, operated by Pacific Gas & Electric Co., and it generated 361,186 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 53rd percentile of U.S. hydro plants. By 2025 generation it ranks 1,732nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

143 MWNameplate capacity
34%Capacity factor, 2025, 53rd percentile, on 120 MW net summer
0.2%Of CA generation, 2025
67 yearsAverage generator age, by MW

How hard does the Poe plant run compared with other hydro plants?

The Poe plant had a capacity factor of 34% in 2025 on 120 MW of net summer capacity, the 53rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 125 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Poe34%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Poe plant generating more or less than last year?

Poe generated 361,186 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 72.8% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024540,615
2025361,186
2026 through August68,980
2025, same months253,855
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202626,229
July 202622,554
June 202618,192
May 20260
April 20260
March 20262,005
February 20260
January 20260
December 202515,721
November 202519,493
October 202524,870
September 202547,247
August 202546,848
July 202538,530
June 202541,654
May 202574,945
April 202551,716
March 2025162
February 20250
January 20250
December 20240
November 20240
October 202411,359
September 202434,836
August 202438,469
July 202429,605
June 202434,871
May 202477,712
April 202488,342
March 202481,521
February 202481,487
January 202462,413

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Poe plant?

Poe made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 197th largest of 1,877 plants in California, the 2,121st largest of 14,327 in the U.S. and the 105th largest of 1,393 hydro plants. By 2025 generation it is the 134th largest of 1,608 generating plants in the state.

Poe within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)143107,4330.1%
Generation (MWh)361,186204,542,8980.2%
Hydro capacity (MW)1439,9361.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Poe plant, and when do they retire?

2 operable generators total 143 MW, with an average age of 67 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s2143100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric711958n/a
2OperatingConventional Hydroelectric711958n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Poe plant?

EIA lists no joint owners for Poe. Pacific Gas & Electric Co. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Pacific Gas & Electric Co. charge homes?

Pacific Gas & Electric Co., the operator of Poe, had an average residential price of 37.52¢ per kWh and an average bill of $174 a month in 2025, 20% above the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Pacific Gas & Electric Co.37.52¢$17420% higher
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Poe plant?

Poe is in Storrie, Butte County, California, at 39.7229° N, 121.4698° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Poe's 143 MW is 1% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
JaybirdEl Dorado162484,740
CaminoEl Dorado158312,070
Judge F CarrShasta154312,634
PoeButte143361,186
Pit 5Shasta142670,754
TrinityTrinity140551,428
Kerckhoff 2Fresno140418,557

Source: EIA Forms EIA-860 and EIA-923, 2025.