Skip to main content
RateWatt

Hydro power plant, California

Jaybird hydroelectric power plant, California

Jaybird is a 162 MW hydro power plant in El Dorado County, California, operated by Sacramento Municipal Util Dist, and it generated 484,740 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 56th percentile of U.S. hydro plants. By 2025 generation it ranks 1,367th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

162 MWNameplate capacity
35%Capacity factor, 2025, 56th percentile, on 156 MW net summer
0.2%Of CA generation, 2025
63 yearsAverage generator age, by MW

How hard does the Jaybird plant run compared with other hydro plants?

The Jaybird plant had a capacity factor of 35% in 2025 on 156 MW of net summer capacity, the 56th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 129 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Jaybird35%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Jaybird plant generating more or less than last year?

Generation at Jaybird rose 15.6% from 2024 to 2025, from 419,161 MWh to 484,740 MWh. Through August 2026 it is running 10.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024419,161
2025484,740
2026 through August295,254
2025, same months328,842
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202648,038
July 202633,184
June 202610,544
May 202617,128
April 202644,468
March 202639,362
February 202641,126
January 202661,404
December 202548,603
November 202530,956
October 202532,915
September 202543,424
August 202542,039
July 202529,826
June 202523,037
May 202557,367
April 202555,163
March 202563,125
February 202543,023
January 202515,262
December 20244,430
November 202411,533
October 202428,713
September 202432,494
August 202448,704
July 202440,240
June 202433,704
May 202467,881
April 202456,818
March 202452,432
February 202431,921
January 202410,291

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Jaybird plant?

Jaybird made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 168th largest of 1,877 plants in California, the 1,887th largest of 14,327 in the U.S. and the 93rd largest of 1,393 hydro plants. By 2025 generation it is the 85th largest of 1,608 generating plants in the state.

Jaybird within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)162107,4330.2%
Generation (MWh)484,740204,542,8980.2%
Hydro capacity (MW)1629,9361.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Jaybird plant, and when do they retire?

2 operable generators total 162 MW, with an average age of 63 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s2162100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
H1OperatingConventional Hydroelectric811961n/a
H2OperatingConventional Hydroelectric811962n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Jaybird plant?

EIA lists no joint owners for Jaybird. Sacramento Municipal Util Dist operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Sacramento Municipal Util Dist charge homes?

Sacramento Municipal Util Dist, the operator of Jaybird, had an average residential price of 18.93¢ per kWh and an average bill of $125 a month in 2025, 40% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Sacramento Municipal Util Dist18.93¢$12540% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Jaybird plant?

Jaybird is in Camino, El Dorado County, California, at 38.8340° N, 120.5318° W. It sits in the Balancing Authority of Northern California balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Jaybird's 162 MW is 2% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
Don PedroTuolumne171279,866
James B BlackShasta169668,423
Pine FlatFresno165331,223
JaybirdEl Dorado162484,740
CaminoEl Dorado158312,070
Judge F CarrShasta154312,634
PoeButte143361,186

Source: EIA Forms EIA-860 and EIA-923, 2025.