Hydro power plant, California
Pine Flat hydroelectric power plant, California
Pine Flat is a 165 MW hydro power plant in Fresno County, California, operated by Kings River Conservation Dist, and it generated 331,223 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 27th percentile of U.S. hydro plants. By 2025 generation it ranks 1,846th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pine Flat plant run compared with other hydro plants?
The Pine Flat plant had a capacity factor of 23% in 2025 on 165 MW of net summer capacity, the 27th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 84 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pine Flat | 23% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pine Flat plant generating more or less than last year?
Pine Flat generated 331,223 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.4% behind the same months of 2025. 2024 has output for only 7 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 450,750 |
| 2025 | 331,223 |
| 2026 through August | 322,380 |
| 2025, same months | 330,429 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 14,648 |
| July 2026 | 81,068 |
| June 2026 | 110,086 |
| May 2026 | 74,792 |
| April 2026 | 28,751 |
| March 2026 | 13,035 |
| February 2026 | 0 |
| January 2026 | 0 |
| December 2025 | 0 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 794 |
| August 2025 | 24,045 |
| July 2025 | 96,898 |
| June 2025 | 114,710 |
| May 2025 | 63,681 |
| April 2025 | 30,853 |
| March 2025 | 242 |
| February 2025 | 0 |
| January 2025 | 0 |
| December 2024 | 0 |
| November 2024 | 0 |
| October 2024 | 0 |
| September 2024 | 4,811 |
| August 2024 | 58,885 |
| July 2024 | 110,724 |
| June 2024 | 118,112 |
| May 2024 | 125,131 |
| April 2024 | 30,789 |
| March 2024 | 2,298 |
| February 2024 | 0 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pine Flat plant, and when do they retire?
3 operable generators total 165 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 3.8 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 3 | 165 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 55 | 1984 | n/a |
| 2 | Operating | Conventional Hydroelectric | 55 | 1984 | n/a |
| 3 | Operating | Conventional Hydroelectric | 55 | 1984 | n/a |
| 4 | Approved, not started | Conventional Hydroelectric | 4 | 2028 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pine Flat plant?
EIA lists no joint owners for Pine Flat. Kings River Conservation Dist operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pine Flat plant?
Pine Flat is in Piedra, Fresno County, California, at 36.8326° N, 119.3270° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in California are similar in size?
California has 238 operable hydro plants with 9,936 MW of capacity, and Pine Flat's 165 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Creek 3 | Fresno | 175 | 673,627 |
| Don Pedro | Tuolumne | 171 | 279,866 |
| James B Black | Shasta | 169 | 668,423 |
| Pine Flat | Fresno | 165 | 331,223 |
| Jaybird | El Dorado | 162 | 484,740 |
| Camino | El Dorado | 158 | 312,070 |
| Judge F Carr | Shasta | 154 | 312,634 |
Source: EIA Forms EIA-860 and EIA-923, 2025.