Don Pedro hydroelectric power plant, California

Don Pedro is a 171 MW hydro power plant in Tuolumne County, California, operated by Turlock Irrigation District, and it generated 279,866 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 12th percentile of U.S. hydro plants. By 2025 generation it ranks 2,061st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

171 MWNameplate capacity
16%Capacity factor, 2025, 12th percentile, on 203 MW net summer
0.1%Of CA generation, 2025
50 yearsAverage generator age, by MW

How hard does the Don Pedro plant run compared with other hydro plants?

The Don Pedro plant had a capacity factor of 16% in 2025 on 203 MW of net summer capacity, the 12th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 57 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Don Pedro16%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Don Pedro plant generating more or less than last year?

Generation at Don Pedro fell 41.0% from 2024 to 2025, from 474,677 MWh to 279,866 MWh. Through August 2026 it is running 3.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024474,677
2025279,866
2026 through August241,012
2025, same months232,556
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202636,866
July 202647,885
June 202640,763
May 202633,644
April 202626,023
March 202632,253
February 202620,826
January 20262,752
December 202524,058
November 20253,986
October 20250
September 202519,266
August 202536,288
July 202545,749
June 202540,845
May 202540,981
April 202534,347
March 202515,040
February 20259,145
January 202510,161
December 20248,515
November 20249,932
October 20247,269
September 202425,559
August 202440,778
July 202455,965
June 202447,774
May 202468,193
April 202478,747
March 202463,790
February 202454,587
January 202413,568

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Don Pedro plant?

Don Pedro made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. By capacity it is the 155th largest of 1,877 plants in California, the 1,819th largest of 14,327 in the U.S. and the 86th largest of 1,393 hydro plants. By 2025 generation it is the 188th largest of 1,608 generating plants in the state.

Don Pedro within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)171107,4330.2%
Generation (MWh)279,866204,542,8980.1%
Hydro capacity (MW)1719,9361.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Don Pedro plant, and when do they retire?

4 operable generators total 171 MW, with an average age of 50 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s313780%none reported
1980s13420%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric461971n/a
2OperatingConventional Hydroelectric461971n/a
3OperatingConventional Hydroelectric461971n/a
4OperatingConventional Hydroelectric341989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Don Pedro plant?

2 owners report shares in Don Pedro; Turlock Irrigation District holds the largest named share, 68.5% or about 117 MW. Turlock Irrigation District operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Turlock Irrigation District68.5%117191,596
Modesto Irrigation District31.5%5488,270

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Turlock Irrigation District charge homes?

Turlock Irrigation District, the operator of Don Pedro, had an average residential price of 17.40¢ per kWh and an average bill of $142 a month in 2025, 44% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Turlock Irrigation District17.40¢$14244% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Don Pedro plant?

Don Pedro is in La Grange, Tuolumne County, California, at 37.6960° N, 120.4202° W. It sits in the Turlock Irrigation District balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Don Pedro's 171 MW is 2% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
Dion R HolmTuolumne180578,435
Spring CreekShasta180385,224
Big Creek 3Fresno175673,627
Don PedroTuolumne171279,866
James B BlackShasta169668,423
Pine FlatFresno165331,223
JaybirdEl Dorado162484,740