Petroleum power plant, Texas

Powerlane Plant, Texas

Powerlane Plant is a 112 MW power plant, 68.2 MW of it petroleum, in Hunt County, Texas, operated by City of Greenville-(TX), and it generated 55,775 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 6th percentile of U.S. petroleum plants. By 2025 generation it ranks 3,957th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

112 MWNameplate capacity
under 1%Capacity factor, 2025, petroleum units, 6th percentile, on 64 MW net summer
3,957thU.S. rank by generation, 2025
44 yearsAverage generator age, by MW

How hard does Powerlane Plant run compared with other petroleum plants?

Powerlane Plant's petroleum units had a capacity factor of under 1% in 2025 on 64 MW of net summer capacity, the 6th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Powerlane Plantunder 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its petroleum generators only. Values above 105% are left out of the comparison.

Is Powerlane Plant generating more or less than last year?

Generation at Powerlane Plant rose 14.0% from 2024 to 2025, from 48,936 MWh to 55,775 MWh.

Net generation by period
PeriodMWh
202448,936
202555,775
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,590
November 20253,050
October 20255,015
September 20255,341
August 20257,654
July 20256,131
June 20255,043
May 20255,542
April 20253,415
March 20252,909
February 20253,291
January 20254,793
December 20242,604
November 20242,637
October 20244,153
September 20243,498
August 20248,513
July 20244,325
June 20244,338
May 20244,880
April 20243,429
March 20242,750
February 20242,148
January 20245,661

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from Powerlane Plant?

Powerlane Plant made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 483rd largest of 1,023 plants in Texas, the 2,414th largest of 14,327 in the U.S. and the 72nd largest of 861 petroleum plants on its petroleum units alone. By 2025 generation it is the 528th largest of 816 generating plants in the state.

Powerlane Plant within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)112195,9660.1%
Generation (MWh)55,775592,896,1760.0%
Petroleum capacity (MW)688498.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Powerlane Plant, and when do they retire?

6 operable generators total 112 MW, with an average age of 44 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s24439%none reported
1970s14339%none reported
2010s32522%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ST1OperatingNatural Gas Steam Turbine191966n/a
ST2OperatingPetroleum Liquids251967n/a
ST3OperatingPetroleum Liquids431978n/a
EPOperatingNatural Gas Internal Combustion Engine82010n/a
EP2OperatingNatural Gas Internal Combustion Engine82010n/a
EP3OperatingNatural Gas Internal Combustion Engine82010n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Powerlane Plant?

EIA lists no joint owners for Powerlane Plant. City of Greenville-(TX) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Greenville charge homes?

City of Greenville, the operator of Powerlane Plant, had an average residential price of 16.65¢ per kWh and an average bill of $174 a month in 2025, 8% above the Texas average of 15.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Texas
City of Greenville16.65¢$1748% higher
Texas average15.40¢$171
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does Powerlane Plant use?

Powerlane Plant has capacity on 2 fuels: 61% petroleum and 39% natural gas. In 2025, petroleum made 1% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Petroleum6860.8%718
Natural gas4439.2%55,057

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is Powerlane Plant?

Powerlane Plant is in Greenville, Hunt County, Texas, at 33.1707° N, 96.1264° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Texas are similar in size?

Texas has 29 operable petroleum plants with 849 MW of capacity, and Powerlane Plant's 68.2 MW is 8% of that.

Petroleum plants in Texas around this size
PlantCountyMW2025 MWh
Powerlane PlantHunt68718
Valero Refinery Corpus Christi WestNueces5734,749

Source: EIA Forms EIA-860 and EIA-923, 2025.