Petroleum power plant, Texas
Valero Refinery Corpus Christi West petroleum power plant, Texas
Valero Refinery Corpus Christi West is a 69.2 MW power plant, 57.2 MW of it petroleum, in Nueces County, Texas, operated by Valero Refining Co, and it generated 82,083 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 86th percentile of U.S. petroleum plants. By 2025 generation it ranks 3,617th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Valero Refinery Corpus Christi West plant run compared with other petroleum plants?
The Valero Refinery Corpus Christi West plant's petroleum units had a capacity factor of 7% in 2025 on 53.2 MW of net summer capacity, the 86th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. That equals about 27 days at full output out of 365.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Valero Refinery Corpus Christi West | 7% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its petroleum generators only. Values above 105% are left out of the comparison.
Is the Valero Refinery Corpus Christi West plant generating more or less than last year?
Generation at Valero Refinery Corpus Christi West fell 17.3% from 2024 to 2025, from 99,303 MWh to 82,083 MWh. Through August 2026 it is running 3.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 99,303 |
| 2025 | 82,083 |
| 2026 through August | 60,592 |
| 2025, same months | 58,740 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,599 |
| July 2026 | 6,881 |
| June 2026 | 7,374 |
| May 2026 | 9,975 |
| April 2026 | 6,276 |
| March 2026 | 7,226 |
| February 2026 | 8,888 |
| January 2026 | 8,373 |
| December 2025 | 7,115 |
| November 2025 | 4,714 |
| October 2025 | 5,662 |
| September 2025 | 5,852 |
| August 2025 | 8,140 |
| July 2025 | 10,432 |
| June 2025 | 6,846 |
| May 2025 | 8,003 |
| April 2025 | 6,608 |
| March 2025 | 7,777 |
| February 2025 | 5,203 |
| January 2025 | 5,731 |
| December 2024 | 5,458 |
| November 2024 | 6,761 |
| October 2024 | 8,724 |
| September 2024 | 6,874 |
| August 2024 | 6,184 |
| July 2024 | 7,440 |
| June 2024 | 7,527 |
| May 2024 | 8,393 |
| April 2024 | 9,446 |
| March 2024 | 10,244 |
| February 2024 | 9,890 |
| January 2024 | 12,362 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Valero Refinery Corpus Christi West plant, and when do they retire?
3 operable generators total 69.2 MW, with an average age of 42 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 7.5 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 3 | 69 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PRU | Operating | All Other | 12 | 1983 | n/a |
| TG1 | Operating | Petroleum Coke | 29 | 1983 | n/a |
| TG2 | Operating | Petroleum Coke | 29 | 1983 | n/a |
| TG3 | Retired | Other Gases | 8 | 1986 | 2006 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Valero Refinery Corpus Christi West plant?
EIA lists no joint owners for Valero Refinery Corpus Christi West. Valero Refining Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Valero Refinery Corpus Christi West plant use?
Valero Refinery Corpus Christi West has capacity on 2 fuels: 83% petroleum and 17% other-fuel. In 2025, petroleum made 42% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Petroleum | 57 | 82.7% | 34,749 |
| Other-fuel | 12 | 17.3% | 32,696 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Valero Refinery Corpus Christi West plant?
Valero Refinery Corpus Christi West is in Corpus Christi, Nueces County, Texas, at 27.8175° N, 97.4814° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in Texas are similar in size?
Texas has 29 operable petroleum plants with 849 MW of capacity, and Valero Refinery Corpus Christi West's 57.2 MW is 7% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Powerlane Plant | Hunt | 68 | 718 |
| Valero Refinery Corpus Christi West | Nueces | 57 | 34,749 |
Source: EIA Forms EIA-860 and EIA-923, 2025.