Skip to main content
RateWatt

Wind power plant, Texas

Pyron Wind Farm LLC Hybrid power plant, Texas

Pyron Wind Farm LLC Hybrid is a 259 MW power plant, 249 MW of it wind, in Fisher County, Texas, operated by RWE Clean Energy, and it generated 940,235 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 86th percentile of U.S. wind plants. By 2025 generation it ranks 764th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

259 MWNameplate capacity
43%Capacity factor, 2025, wind units, 86th percentile, on 249 MW net summer
0.2%Of TX generation, 2025
16 yearsAverage generator age, by MW

How hard does the Pyron Wind Farm LLC Hybrid plant run compared with other wind plants?

The Pyron Wind Farm LLC Hybrid plant's wind units had a capacity factor of 43% in 2025 on 249 MW of net summer capacity, the 86th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 158 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pyron Wind Farm LLC Hybrid43%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.

Is the Pyron Wind Farm LLC Hybrid plant generating more or less than last year?

Generation at Pyron Wind Farm LLC Hybrid rose 12.5% from 2024 to 2025, from 835,777 MWh to 940,235 MWh. Through August 2026 it is running 4.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024835,777
2025940,235
2026 through August675,615
2025, same months649,307
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202668,458
July 202662,211
June 202698,769
May 202683,571
April 202696,778
March 2026112,289
February 202672,158
January 202681,381
December 2025100,446
November 202576,140
October 202567,562
September 202546,780
August 202551,656
July 202564,068
June 202589,967
May 202572,722
April 2025104,265
March 2025109,786
February 202579,343
January 202577,500
December 202476,295
November 202479,522
October 202481,940
September 202437,739
August 202454,435
July 202455,992
June 202483,268
May 202478,553
April 202499,032
March 202479,474
February 202456,116
January 202453,411

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Pyron Wind Farm LLC Hybrid plant?

Pyron Wind Farm LLC Hybrid made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 198th largest of 1,023 plants in Texas, the 1,209th largest of 14,327 in the U.S. and the 152nd largest of 1,358 wind plants on its wind units alone. By 2025 generation it is the 124th largest of 816 generating plants in the state.

Pyron Wind Farm LLC Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)259195,9660.1%
Generation (MWh)940,235592,896,1760.2%
Wind capacity (MW)24943,9420.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pyron Wind Farm LLC Hybrid plant, and when do they retire?

2 operable generators total 259 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s124996%none reported
2010s1104%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2492009n/a
PYRBTOperatingBatteries102018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pyron Wind Farm LLC Hybrid plant?

EIA lists no joint owners for Pyron Wind Farm LLC Hybrid. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Pyron Wind Farm LLC Hybrid plant use?

Pyron Wind Farm LLC Hybrid has capacity on 2 fuels: 96% wind and 4% battery and pumped storage. In 2025, wind made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Wind24996.2%943,140
Battery and pumped storage103.8%-2,905

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Pyron Wind Farm LLC Hybrid plant?

Pyron Wind Farm LLC Hybrid is in Hermleigh, Fisher County, Texas, at 32.5886° N, 100.6728° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Pyron Wind Farm LLC Hybrid's 249 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Willow Springs Wind FarmHaskell250870,633
Amadeus Wind FarmFisher250716,480
Javelina Wind Energy, LLCWebb250925,294
Pyron Wind Farm LLC HybridFisher249943,140
Peyton Creek Wind Farm IIMatagorda243464,197
El Campo WindKnox243839,702
Coyote Wind LLCScurry243646,134

Source: EIA Forms EIA-860 and EIA-923, 2025.