Wind power plant, Texas
Peyton Creek Wind Farm II power plant, Texas
Peyton Creek Wind Farm II is a 243 MW wind power plant in Matagorda County, Texas, operated by RWE Clean Energy, and it generated 464,197 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 13th percentile of U.S. wind plants. By 2025 generation it ranks 1,422nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Peyton Creek Wind Farm II plant run compared with other wind plants?
The Peyton Creek Wind Farm II plant had a capacity factor of 22% in 2025 on 243 MW of net summer capacity, the 13th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Peyton Creek Wind Farm II | 22% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Peyton Creek Wind Farm II plant generating more or less than last year?
Peyton Creek Wind Farm II generated 464,197 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 65.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 464,197 |
| 2026 through August | 448,724 |
| 2025, same months | 271,696 |
Monthly generation, Feb 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 34,801 |
| July 2026 | 31,094 |
| June 2026 | 48,777 |
| May 2026 | 50,921 |
| April 2026 | 69,829 |
| March 2026 | 66,306 |
| February 2026 | 68,696 |
| January 2026 | 78,300 |
| December 2025 | 59,569 |
| November 2025 | 65,002 |
| October 2025 | 40,692 |
| September 2025 | 27,238 |
| August 2025 | 19,241 |
| July 2025 | 42,576 |
| June 2025 | 51,429 |
| May 2025 | 65,867 |
| April 2025 | 67,279 |
| March 2025 | 19,773 |
| February 2025 | 5,531 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Peyton Creek Wind Farm II plant, and when do they retire?
1 operable generator totals 243 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 243 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WT2 | Operating | Onshore Wind Turbine | 243 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Peyton Creek Wind Farm II plant?
EIA lists no joint owners for Peyton Creek Wind Farm II. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Peyton Creek Wind Farm II plant?
Peyton Creek Wind Farm II is in Bay City, Matagorda County, Texas, at 28.8968° N, 95.8652° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Peyton Creek Wind Farm II's 243 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Amadeus Wind Farm | Fisher | 250 | 716,480 |
| Javelina Wind Energy, LLC | Webb | 250 | 925,294 |
| Pyron Wind Farm LLC Hybrid | Fisher | 249 | 943,140 |
| Peyton Creek Wind Farm II | Matagorda | 243 | 464,197 |
| El Campo Wind | Knox | 243 | 839,702 |
| Coyote Wind LLC | Scurry | 243 | 646,134 |
| Sweetwater Wind 4 LLC | Nolan | 241 | 633,362 |
Source: EIA Forms EIA-860 and EIA-923, 2025.