Sweetwater Wind 4 LLC power plant, Texas

Sweetwater Wind 4 LLC is a 241 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC, and it generated 633,362 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 39th percentile of U.S. wind plants. By 2025 generation it ranks 1,082nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

241 MWNameplate capacity
30%Capacity factor, 2025, 39th percentile, on 241 MW net summer
0.1%Of TX generation, 2025
18 yearsAverage generator age, by MW

How hard does the Sweetwater Wind 4 LLC plant run compared with other wind plants?

The Sweetwater Wind 4 LLC plant had a capacity factor of 30% in 2025 on 241 MW of net summer capacity, the 39th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sweetwater Wind 4 LLC30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sweetwater Wind 4 LLC plant generating more or less than last year?

Generation at Sweetwater Wind 4 LLC rose 1.8% from 2024 to 2025, from 621,909 MWh to 633,362 MWh. Through August 2026 it is running 0.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024621,909
2025633,362
2026 through August443,568
2025, same months444,669
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202639,374
July 202637,872
June 202668,194
May 202656,560
April 202660,830
March 202678,901
February 202649,948
January 202651,889
December 202559,295
November 202550,947
October 202548,855
September 202529,596
August 202531,370
July 202540,041
June 202564,435
May 202550,664
April 202574,247
March 202576,448
February 202551,996
January 202555,468
December 202454,403
November 202459,899
October 202455,983
September 202425,402
August 202434,392
July 202437,094
June 202458,748
May 202456,136
April 202470,643
March 202457,483
February 202461,954
January 202449,772

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Sweetwater Wind 4 LLC plant?

Sweetwater Wind 4 LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 230th largest of 1,023 plants in Texas, the 1,314th largest of 14,327 in the U.S. and the 162nd largest of 1,358 wind plants. By 2025 generation it is the 211th largest of 816 generating plants in the state.

Sweetwater Wind 4 LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)241195,9660.1%
Generation (MWh)633,362592,896,1760.1%
Wind capacity (MW)24143,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sweetwater Wind 4 LLC plant, and when do they retire?

1 operable generator totals 241 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1241100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SW4OperatingOnshore Wind Turbine2412007n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sweetwater Wind 4 LLC plant?

EIA lists no joint owners for Sweetwater Wind 4 LLC. Leeward Asset Management, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sweetwater Wind 4 LLC plant?

Sweetwater Wind 4 LLC is in Roscoe, Nolan County, Texas, at 32.3122° N, 100.5303° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Sweetwater Wind 4 LLC's 241 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Peyton Creek Wind Farm IIMatagorda243464,197
El Campo WindKnox243839,702
Coyote Wind LLCScurry243646,134
Sweetwater Wind 4 LLCNolan241633,362
West Raymond Wind Farm LLCWillacy240761,752
Blackjack Creek Wind FarmBee240555,037
Monte Cristo 1Hidalgo239168,089

Source: EIA Forms EIA-860 and EIA-923, 2025.