Wind power plant, California
Ridgetop Energy LLC wind power plant, California
Ridgetop Energy LLC is a 29 MW wind power plant in Kern County, California, operated by Terra-Gen Operating Co-Wind, and it generated 24,474 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. wind plants. By 2025 generation it ranks 4,986th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Ridgetop Energy LLC plant run compared with other wind plants?
The Ridgetop Energy LLC plant had a capacity factor of 10% in 2025 on 29 MW of net summer capacity, the 2nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 35 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Ridgetop Energy LLC | 10% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Ridgetop Energy LLC plant generating more or less than last year?
Generation at Ridgetop Energy LLC fell 9.5% from 2024 to 2025, from 27,038 MWh to 24,474 MWh.
| Period | MWh |
|---|---|
| 2024 | 27,038 |
| 2025 | 24,474 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,765 |
| November 2025 | 1,166 |
| October 2025 | 1,545 |
| September 2025 | 1,639 |
| August 2025 | 2,620 |
| July 2025 | 2,681 |
| June 2025 | 2,798 |
| May 2025 | 3,389 |
| April 2025 | 2,805 |
| March 2025 | 1,583 |
| February 2025 | 1,403 |
| January 2025 | 1,080 |
| December 2024 | 1,664 |
| November 2024 | 1,455 |
| October 2024 | 1,786 |
| September 2024 | 1,651 |
| August 2024 | 2,492 |
| July 2024 | 1,566 |
| June 2024 | 2,573 |
| May 2024 | 3,266 |
| April 2024 | 2,958 |
| March 2024 | 3,059 |
| February 2024 | 1,682 |
| January 2024 | 2,886 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Ridgetop Energy LLC plant, and when do they retire?
1 operable generator totals 29 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 29 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WGN1 | Operating | Onshore Wind Turbine | 29 | 1984 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Ridgetop Energy LLC plant?
Ridgetop Energy LLC is the only joint owner reported for Ridgetop Energy LLC, with 100.0%. Terra-Gen Operating Co-Wind operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Ridgetop Energy LLC plant?
Ridgetop Energy LLC is in Mojave, Kern County, California, at 35.0697° N, 118.3167° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in California are similar in size?
California has 111 operable wind plants with 6,479 MW of capacity, and Ridgetop Energy LLC's 29 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Oak Creek Energy Systems I | Kern | 35 | 57,279 |
| San Gorgonio Farms Wind Farm | Riverside | 31 | 51,676 |
| Mesa Wind Power LLC | Riverside | 30 | 122,796 |
| Ridgetop Energy LLC | Kern | 29 | 24,474 |
| TPC Windfarms LLC | Kern | 29 | 42,113 |
| Difwind Farms Ltd VI | Kern | 27 | 12,635 |
| AM Wind Repower | Riverside | 27 | 84,057 |
Source: EIA Forms EIA-860 and EIA-923, 2025.