Biomass power plant, California

Rio Bravo Rocklin biomass power plant, California

Rio Bravo Rocklin is a 27.9 MW biomass power plant in Placer County, California, operated by Rio Bravo Rocklin, and it generated 146,962 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 80th percentile of U.S. biomass plants. By 2025 generation it ranks 2,934th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

27.9 MWNameplate capacity
68%Capacity factor, 2025, 80th percentile, on 24.4 MW net summer
0.1%Of CA generation, 2025
36 yearsAverage generator age, by MW

How hard does the Rio Bravo Rocklin plant run compared with other biomass plants?

The Rio Bravo Rocklin plant had a capacity factor of 68% in 2025 on 24.4 MW of net summer capacity, the 80th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 248 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rio Bravo Rocklin68%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Rio Bravo Rocklin plant generating more or less than last year?

Generation at Rio Bravo Rocklin fell 5.3% from 2024 to 2025, from 155,189 MWh to 146,962 MWh.

Net generation by period
PeriodMWh
2024155,189
2025146,962
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202516,350
November 20257,337
October 20254,543
September 202516,366
August 202514,355
July 202511,628
June 202511,249
May 202517,555
April 20256,689
March 202513,978
February 202512,614
January 202514,298
December 202415,634
November 202415,842
October 20247,206
September 202412,562
August 202411,705
July 202417,361
June 202414,198
May 202415,228
April 20247,291
March 202413,569
February 202412,138
January 202412,455

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Rio Bravo Rocklin plant?

Rio Bravo Rocklin made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 2.8 times its share of capacity. By capacity it is the 575th largest of 1,877 plants in California, the 4,469th largest of 14,327 in the U.S. and the 152nd largest of 585 biomass plants. By 2025 generation it is the 297th largest of 1,608 generating plants in the state.

Rio Bravo Rocklin within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)28107,4330.0%
Generation (MWh)146,962204,542,8980.1%
Biomass capacity (MW)281,0892.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rio Bravo Rocklin plant, and when do they retire?

1 operable generator totals 27.9 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s128100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingWood/Wood Waste Biomass281989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rio Bravo Rocklin plant?

EIA lists no joint owners for Rio Bravo Rocklin. Rio Bravo Rocklin operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Rio Bravo Rocklin plant?

Rio Bravo Rocklin is in Lincoln, Placer County, California, at 38.8319° N, 121.3137° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in California are similar in size?

California has 99 operable biomass plants with 1,089 MW of capacity, and Rio Bravo Rocklin's 27.9 MW is 3% of that.

Biomass plants in California around this size
PlantCountyMW2025 MWh
Wadham EnergyColusa29144,032
Woodland Biomass Power LtdYolo28161,131
Covanta MendotaFresno28n/a
Rio Bravo RocklinPlacer28145,470
Pacific-Ultrapower Chinese StationTuolumne25125,662
Bowerman Power LFG, LLCOrange24151,369
Sunshine Gas ProducersLos Angeles23130,260

Source: EIA Forms EIA-860 and EIA-923, 2025.