Biomass power plant, California

Woodland Biomass Power Ltd power plant, California

Woodland Biomass Power Ltd is a 28 MW biomass power plant in Yolo County, California, operated by DTE Energy Services-Woodland, and it generated 161,896 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 86th percentile of U.S. biomass plants. By 2025 generation it ranks 2,794th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

28 MWNameplate capacity
74%Capacity factor, 2025, 86th percentile, on 25 MW net summer
0.1%Of CA generation, 2025
36 yearsAverage generator age, by MW

How hard does the Woodland Biomass Power Ltd plant run compared with other biomass plants?

The Woodland Biomass Power Ltd plant had a capacity factor of 74% in 2025 on 25 MW of net summer capacity, the 86th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 269 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Woodland Biomass Power Ltd74%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Woodland Biomass Power Ltd plant generating more or less than last year?

Generation at Woodland Biomass Power Ltd fell 5.3% from 2024 to 2025, from 170,887 MWh to 161,896 MWh.

Net generation by period
PeriodMWh
2024170,887
2025161,896
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202516,206
November 20258,553
October 202514,321
September 202517,331
August 202514,382
July 20258,690
June 202513,562
May 202517,937
April 20252,777
March 202516,548
February 202515,930
January 202515,659
December 202418,181
November 20249,180
October 202417,243
September 202415,247
August 202415,827
July 202417,879
June 202417,521
May 202410,821
April 20242,477
March 202414,241
February 202415,154
January 202417,116

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Woodland Biomass Power Ltd plant?

Woodland Biomass Power Ltd made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 3.0 times its share of capacity. By capacity it is the 573rd largest of 1,877 plants in California, the 4,456th largest of 14,327 in the U.S. and the 147th largest of 585 biomass plants. By 2025 generation it is the 283rd largest of 1,608 generating plants in the state.

Woodland Biomass Power Ltd within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)28107,4330.0%
Generation (MWh)161,896204,542,8980.1%
Biomass capacity (MW)281,0892.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Woodland Biomass Power Ltd plant, and when do they retire?

1 operable generator totals 28 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s128100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingWood/Wood Waste Biomass281989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Woodland Biomass Power Ltd plant?

DTE Energy Services is the only joint owner reported for Woodland Biomass Power Ltd, with 100.0%. DTE Energy Services-Woodland operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Woodland Biomass Power Ltd plant?

Woodland Biomass Power Ltd is in Woodland, Yolo County, California, at 38.6905° N, 121.7371° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in California are similar in size?

California has 99 operable biomass plants with 1,089 MW of capacity, and Woodland Biomass Power Ltd's 28 MW is 3% of that.

Biomass plants in California around this size
PlantCountyMW2025 MWh
Burney Forest ProductsShasta3171,993
SPI Anderson 2Shasta30121,201
Wadham EnergyColusa29144,032
Woodland Biomass Power LtdYolo28161,131
Covanta MendotaFresno28n/a
Rio Bravo RocklinPlacer28145,470
Pacific-Ultrapower Chinese StationTuolumne25125,662