Solar power plant, California
Rio Bravo Solar II LLC power plant, California
Rio Bravo Solar II LLC is a 20 MW solar power plant in Kern County, California, operated by Deriva Energy, and it generated 51,654 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 92nd percentile of U.S. solar plants. By 2025 generation it ranks 4,061st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rio Bravo Solar II LLC plant run compared with other solar plants?
The Rio Bravo Solar II LLC plant had a capacity factor of 30% in 2025 on 19.5 MW of net summer capacity, the 92nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rio Bravo Solar II LLC | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Rio Bravo Solar II LLC plant generating more or less than last year?
Generation at Rio Bravo Solar II LLC rose 1.8% from 2024 to 2025, from 50,755 MWh to 51,654 MWh.
| Period | MWh |
|---|---|
| 2024 | 50,755 |
| 2025 | 51,654 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 689 |
| November 2025 | 1,987 |
| October 2025 | 4,063 |
| September 2025 | 4,479 |
| August 2025 | 5,785 |
| July 2025 | 6,724 |
| June 2025 | 6,552 |
| May 2025 | 6,290 |
| April 2025 | 4,921 |
| March 2025 | 4,228 |
| February 2025 | 2,981 |
| January 2025 | 2,955 |
| December 2024 | 1,858 |
| November 2024 | 2,533 |
| October 2024 | 3,622 |
| September 2024 | 4,730 |
| August 2024 | 5,720 |
| July 2024 | 6,042 |
| June 2024 | 6,246 |
| May 2024 | 6,256 |
| April 2024 | 4,417 |
| March 2024 | 4,288 |
| February 2024 | 2,889 |
| January 2024 | 2,154 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rio Bravo Solar II LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 20 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rio Bravo Solar II LLC plant?
Leeward Asset Management, LLC is the only joint owner reported for Rio Bravo Solar II LLC, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Rio Bravo Solar II LLC plant?
Rio Bravo Solar II LLC is in McKittrick, Kern County, California, at 35.4225° N, 119.6292° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Rio Bravo Solar II LLC's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| CID Solar, LLC | Kings | 20 | 40,678 |
| Lone Valley Solar Park II LLC | San Bernardino | 20 | 53,128 |
| Rio Bravo Solar 1 LLC | Kern | 20 | 52,092 |
| Rio Bravo Solar II LLC | Kern | 20 | 51,654 |
| Pumpjack Solar I | Kern | 20 | 50,631 |
| Shafter Solar LLC | Kern | 20 | 41,184 |
| Algonquin SKIC20 Solar LLC | Kern | 20 | 40,509 |
Source: EIA Forms EIA-860 and EIA-923, 2025.