Solar power plant, California
Rio Bravo Solar 1 LLC power plant, California
Rio Bravo Solar 1 LLC is a 20 MW solar power plant in Kern County, California, operated by Deriva Energy, and it generated 52,092 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 4,049th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rio Bravo Solar 1 LLC plant run compared with other solar plants?
The Rio Bravo Solar 1 LLC plant had a capacity factor of 30% in 2025 on 19.5 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rio Bravo Solar 1 LLC | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Rio Bravo Solar 1 LLC plant generating more or less than last year?
Generation at Rio Bravo Solar 1 LLC fell 0.4% from 2024 to 2025, from 52,320 MWh to 52,092 MWh.
| Period | MWh |
|---|---|
| 2024 | 52,320 |
| 2025 | 52,092 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 778 |
| November 2025 | 1,962 |
| October 2025 | 4,099 |
| September 2025 | 4,585 |
| August 2025 | 5,748 |
| July 2025 | 6,662 |
| June 2025 | 6,634 |
| May 2025 | 6,420 |
| April 2025 | 4,967 |
| March 2025 | 4,247 |
| February 2025 | 2,938 |
| January 2025 | 3,052 |
| December 2024 | 1,918 |
| November 2024 | 2,620 |
| October 2024 | 3,861 |
| September 2024 | 4,763 |
| August 2024 | 5,609 |
| July 2024 | 6,223 |
| June 2024 | 5,937 |
| May 2024 | 6,788 |
| April 2024 | 5,138 |
| March 2024 | 4,424 |
| February 2024 | 2,937 |
| January 2024 | 2,102 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rio Bravo Solar 1 LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 20 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rio Bravo Solar 1 LLC plant?
Leeward Asset Management, LLC is the only joint owner reported for Rio Bravo Solar 1 LLC, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Rio Bravo Solar 1 LLC plant?
Rio Bravo Solar 1 LLC is in McKittrick, Kern County, California, at 35.4161° N, 119.6825° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Rio Bravo Solar 1 LLC's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Calipatria Solar Farm | Imperial | 20 | 36,119 |
| CID Solar, LLC | Kings | 20 | 40,678 |
| Lone Valley Solar Park II LLC | San Bernardino | 20 | 53,128 |
| Rio Bravo Solar 1 LLC | Kern | 20 | 52,092 |
| Rio Bravo Solar II LLC | Kern | 20 | 51,654 |
| Pumpjack Solar I | Kern | 20 | 50,631 |
| Shafter Solar LLC | Kern | 20 | 41,184 |
Source: EIA Forms EIA-860 and EIA-923, 2025.