Solar power plant, California
Calipatria Solar Farm, California
Calipatria Solar Farm is a 20 MW solar power plant in Imperial County, California, operated by Southern Power Co, and it generated 36,119 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 29th percentile of U.S. solar plants. By 2025 generation it ranks 4,500th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Calipatria Solar Farm plant run compared with other solar plants?
The Calipatria Solar Farm plant had a capacity factor of 21% in 2025 on 20 MW of net summer capacity, the 29th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 75 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Calipatria Solar Farm | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Calipatria Solar Farm plant generating more or less than last year?
Generation at Calipatria Solar Farm fell 5.7% from 2024 to 2025, from 38,317 MWh to 36,119 MWh.
| Period | MWh |
|---|---|
| 2024 | 38,317 |
| 2025 | 36,119 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,128 |
| November 2025 | 2,268 |
| October 2025 | 3,303 |
| September 2025 | 3,495 |
| August 2025 | 3,715 |
| July 2025 | 4,410 |
| June 2025 | 4,370 |
| May 2025 | 4,275 |
| April 2025 | 1,873 |
| March 2025 | 1,873 |
| February 2025 | 2,192 |
| January 2025 | 2,217 |
| December 2024 | 1,999 |
| November 2024 | 2,342 |
| October 2024 | 3,125 |
| September 2024 | 3,643 |
| August 2024 | 4,136 |
| July 2024 | 4,391 |
| June 2024 | 4,623 |
| May 2024 | 4,105 |
| April 2024 | 3,443 |
| March 2024 | 2,668 |
| February 2024 | 2,523 |
| January 2024 | 1,319 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Calipatria Solar Farm plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN 1 | Operating | Solar Photovoltaic | 20 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Calipatria Solar Farm plant?
Calipatria, LLC is the only joint owner reported for Calipatria Solar Farm, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Calipatria Solar Farm plant?
Calipatria Solar Farm is in Calipatria, Imperial County, California, at 33.1658° N, 115.5322° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Calipatria Solar Farm's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| RE Kansas Solar, LLC | Kings | 20 | 23,996 |
| RE Old River One, LLC | Kern | 20 | 37,520 |
| RE Kent South, LLC | Kings | 20 | 35,670 |
| Calipatria Solar Farm | Imperial | 20 | 36,119 |
| CID Solar, LLC | Kings | 20 | 40,678 |
| Lone Valley Solar Park II LLC | San Bernardino | 20 | 53,128 |
| Rio Bravo Solar 1 LLC | Kern | 20 | 52,092 |
Source: EIA Forms EIA-860 and EIA-923, 2025.