RE Old River One, LLC solar power plant, California

RE Old River One, LLC is a 20 MW solar power plant in Kern County, California, operated by Onward Energy, and it generated 37,520 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 36th percentile of U.S. solar plants. By 2025 generation it ranks 4,442nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
21%Capacity factor, 2025, 36th percentile, on 20 MW net summer
4,442ndU.S. rank by generation, 2025
11 yearsAverage generator age, by MW

How hard does the RE Old River One, LLC plant run compared with other solar plants?

The RE Old River One, LLC plant had a capacity factor of 21% in 2025 on 20 MW of net summer capacity, the 36th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
RE Old River One, LLC21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the RE Old River One, LLC plant generating more or less than last year?

Generation at RE Old River One, LLC rose 5.3% from 2024 to 2025, from 35,628 MWh to 37,520 MWh.

Net generation by period
PeriodMWh
202435,628
202537,520
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025299
November 2025706
October 20252,893
September 20253,109
August 20254,237
July 20255,006
June 20255,099
May 20254,880
April 20254,091
March 20253,314
February 20251,494
January 20252,392
December 20241,067
November 2024834
October 2024995
September 20241,968
August 20244,664
July 20244,993
June 20245,168
May 20245,469
April 20243,594
March 20243,045
February 20242,293
January 20241,538

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the RE Old River One, LLC plant?

RE Old River One, LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,110th largest of 7,223 solar plants. By 2025 generation it is the 538th largest of 1,608 generating plants in the state.

RE Old River One, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)37,520204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the RE Old River One, LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic202014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the RE Old River One, LLC plant?

EIA lists no joint owners for RE Old River One, LLC. Onward Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the RE Old River One, LLC plant?

RE Old River One, LLC is in Bakersfield, Kern County, California, at 35.2233° N, 119.0889° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and RE Old River One, LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Sol Orchard El Centro PVImperial2045,147
Western Antelope Blue Sky Ranch ALos Angeles2043,001
RE Kansas Solar, LLCKings2023,996
RE Old River One, LLCKern2037,520
RE Kent South, LLCKings2035,670
Calipatria Solar FarmImperial2036,119
CID Solar, LLCKings2040,678

Source: EIA Forms EIA-860 and EIA-923, 2025.