Solar power plant, Rhode Island
Robin Hollow Solar power plant, Rhode Island
Robin Hollow Solar is a 40.7 MW solar power plant in Kent County, Rhode Island, operated by Robin Hollow Solar, LLC, and it generated 67,931 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Rhode Island, and its capacity factor sits at the 21st percentile of U.S. solar plants. By 2025 generation it ranks 3,774th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Robin Hollow Solar plant run compared with other solar plants?
The Robin Hollow Solar plant had a capacity factor of 19% in 2025 on 40.6 MW of net summer capacity, the 21st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 70 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Robin Hollow Solar | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Robin Hollow Solar plant generating more or less than last year?
Generation at Robin Hollow Solar fell 1.1% from 2024 to 2025, from 68,666 MWh to 67,931 MWh. Through August 2026 it is running 4.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 68,666 |
| 2025 | 67,931 |
| 2026 through August | 51,035 |
| 2025, same months | 48,852 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 7,477 |
| July 2026 | 8,066 |
| June 2026 | 8,439 |
| May 2026 | 7,498 |
| April 2026 | 7,034 |
| March 2026 | 5,831 |
| February 2026 | 4,071 |
| January 2026 | 2,619 |
| December 2025 | 3,076 |
| November 2025 | 3,928 |
| October 2025 | 5,452 |
| September 2025 | 6,623 |
| August 2025 | 7,917 |
| July 2025 | 7,555 |
| June 2025 | 7,307 |
| May 2025 | 4,615 |
| April 2025 | 6,544 |
| March 2025 | 6,452 |
| February 2025 | 4,571 |
| January 2025 | 3,891 |
| December 2024 | 3,170 |
| November 2024 | 4,633 |
| October 2024 | 6,398 |
| September 2024 | 6,158 |
| August 2024 | 7,176 |
| July 2024 | 6,988 |
| June 2024 | 7,850 |
| May 2024 | 6,914 |
| April 2024 | 6,248 |
| March 2024 | 6,083 |
| February 2024 | 4,815 |
| January 2024 | 2,233 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Robin Hollow Solar plant, and when do they retire?
1 operable generator totals 40.7 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 41 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RSH40 | Operating | Solar Photovoltaic | 41 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Robin Hollow Solar plant?
EIA lists no joint owners for Robin Hollow Solar. Robin Hollow Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Robin Hollow Solar plant?
Robin Hollow Solar is in West Greenwich, Kent County, Rhode Island, at 41.6402° N, 71.6295° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Rhode Island are similar in size?
Rhode Island has 77 operable solar plants with 452 MW of capacity, and Robin Hollow Solar's 40.7 MW is 9% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Robin Hollow Solar | Kent | 41 | 67,931 |
| Dry Bridge Solar (Brown University) | Washington | 40 | 67,601 |
| University Solar, LLC | Kent | 24 | 28,457 |
Source: EIA Forms EIA-860 and EIA-923, 2025.