Wind power plant, Oklahoma
Rocky Ridge Wind Project, Oklahoma
Rocky Ridge Wind Project is a 149 MW wind power plant in Kiowa County, Oklahoma, operated by Rocky Ridge Wind Project LLC, and it generated 321,675 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Oklahoma, and its capacity factor sits at the 21st percentile of U.S. wind plants. By 2025 generation it ranks 1,871st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rocky Ridge Wind Project plant run compared with other wind plants?
The Rocky Ridge Wind Project plant had a capacity factor of 25% in 2025 on 149 MW of net summer capacity, the 21st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rocky Ridge Wind Project | 25% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Rocky Ridge Wind Project plant generating more or less than last year?
Generation at Rocky Ridge Wind Project rose 24.0% from 2024 to 2025, from 259,483 MWh to 321,675 MWh.
| Period | MWh |
|---|---|
| 2024 | 259,483 |
| 2025 | 321,675 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 33,702 |
| November 2025 | 24,218 |
| October 2025 | 27,448 |
| September 2025 | 23,078 |
| August 2025 | 30,551 |
| July 2025 | 35,462 |
| June 2025 | 34,803 |
| May 2025 | 22,882 |
| April 2025 | 18,812 |
| March 2025 | 22,996 |
| February 2025 | 21,660 |
| January 2025 | 26,063 |
| December 2024 | 11,096 |
| November 2024 | 4,885 |
| October 2024 | 20,814 |
| September 2024 | 24,138 |
| August 2024 | 35,064 |
| July 2024 | 27,083 |
| June 2024 | 32,344 |
| May 2024 | 26,020 |
| April 2024 | 20,442 |
| March 2024 | 15,940 |
| February 2024 | 17,200 |
| January 2024 | 24,457 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rocky Ridge Wind Project plant, and when do they retire?
1 operable generator totals 149 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 149 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE 1. | Operating | Onshore Wind Turbine | 149 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rocky Ridge Wind Project plant?
EIA lists no joint owners for Rocky Ridge Wind Project. Rocky Ridge Wind Project LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Rocky Ridge Wind Project plant?
Rocky Ridge Wind Project is in Hobart, Kiowa County, Oklahoma, at 35.1356° N, 99.0031° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oklahoma are similar in size?
Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Rocky Ridge Wind Project's 149 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blue Canyon Windpower II | Comanche | 151 | 565,683 |
| Osage Wind, LLC | Osage | 150 | 480,273 |
| Origin Wind | Murray | 150 | 295,728 |
| Rocky Ridge Wind Project | Kiowa | 149 | 321,675 |
| Boiling Springs Wind Farm | Woodward | 148 | 577,279 |
| Grant Plains Wind, LLC | Grant | 147 | 473,393 |
| Weatherford Wind Energy Center | Custer | 147 | 610,093 |
Source: EIA Forms EIA-860 and EIA-923, 2025.