Solar power plant, Arkansas
Searcy Solar Hybrid power plant, Arkansas
Searcy Solar Hybrid is a 110 MW power plant, 100 MW of it solar, in White County, Arkansas, operated by Searcy Solar, LLC, and it generated 193,180 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Arkansas, and its capacity factor sits at the 41st percentile of U.S. solar plants. By 2025 generation it ranks 2,543rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Searcy Solar Hybrid plant run compared with other solar plants?
The Searcy Solar Hybrid plant's solar units had a capacity factor of 22% in 2025 on 100 MW of net summer capacity, the 41st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Searcy Solar Hybrid | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Searcy Solar Hybrid plant generating more or less than last year?
Generation at Searcy Solar Hybrid fell 6.4% from 2024 to 2025, from 206,397 MWh to 193,180 MWh. Through August 2026 it is running 15.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 206,397 |
| 2025 | 193,180 |
| 2026 through August | 125,667 |
| 2025, same months | 148,203 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 21,109 |
| July 2026 | 20,500 |
| June 2026 | 19,496 |
| May 2026 | 15,679 |
| April 2026 | 15,117 |
| March 2026 | 12,369 |
| February 2026 | 11,882 |
| January 2026 | 9,515 |
| December 2025 | 6,289 |
| November 2025 | 10,893 |
| October 2025 | 9,039 |
| September 2025 | 18,756 |
| August 2025 | 23,422 |
| July 2025 | 24,418 |
| June 2025 | 20,597 |
| May 2025 | 18,012 |
| April 2025 | 17,666 |
| March 2025 | 19,330 |
| February 2025 | 11,885 |
| January 2025 | 12,873 |
| December 2024 | 8,272 |
| November 2024 | 11,250 |
| October 2024 | 20,062 |
| September 2024 | 16,441 |
| August 2024 | 24,074 |
| July 2024 | 23,866 |
| June 2024 | 22,052 |
| May 2024 | 20,798 |
| April 2024 | 19,333 |
| March 2024 | 16,911 |
| February 2024 | 13,694 |
| January 2024 | 9,644 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Searcy Solar Hybrid plant, and when do they retire?
2 operable generators total 110 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 110 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SEABT | Operating | Batteries | 10 | 2022 | n/a |
| SEARC | Operating | Solar Photovoltaic | 100 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Searcy Solar Hybrid plant?
EIA lists no joint owners for Searcy Solar Hybrid. Searcy Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Searcy Solar Hybrid plant use?
Searcy Solar Hybrid has capacity on 2 fuels: 91% solar and 9% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 100 | 90.9% | 193,180 |
| Battery and pumped storage | 10 | 9.1% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Searcy Solar Hybrid plant?
Searcy Solar Hybrid is in Searcy, White County, Arkansas, at 35.2330° N, 91.6900° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arkansas are similar in size?
Arkansas has 65 operable solar plants with 2,534 MW of capacity, and Searcy Solar Hybrid's 100 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Quartz Solar, LLC | Cross | 135 | 292,992 |
| Woodruff County Solar | Woodruff | 122 | 203,703 |
| Prairie Mist Solar | Ashley | 109 | 232,039 |
| Searcy Solar Hybrid | White | 100 | 193,180 |
| Chicot Solar | Chicot | 100 | 214,881 |
| Walnut Bend Solar Station PV | Lee | 100 | 209,977 |
| Crossett Solar | Ashley | 100 | 208,718 |
Source: EIA Forms EIA-860 and EIA-923, 2025.