Skip to main content
RateWatt

Wind power plant, Illinois

Settlers Trail Wind Farm LLC power plant, Illinois

Settlers Trail Wind Farm LLC is a 150 MW wind power plant in Iroquois County, Illinois, operated by RWE Clean Energy, and it generated 320,385 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 20th percentile of U.S. wind plants. By 2025 generation it ranks 1,882nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
24%Capacity factor, 2025, 20th percentile, on 150 MW net summer
0.2%Of IL generation, 2025
14 yearsAverage generator age, by MW

How hard does the Settlers Trail Wind Farm LLC plant run compared with other wind plants?

The Settlers Trail Wind Farm LLC plant had a capacity factor of 24% in 2025 on 150 MW of net summer capacity, the 20th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Settlers Trail Wind Farm LLC24%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Settlers Trail Wind Farm LLC plant generating more or less than last year?

Generation at Settlers Trail Wind Farm LLC fell 9.5% from 2024 to 2025, from 353,945 MWh to 320,385 MWh.

Net generation by period
PeriodMWh
2024353,945
2025320,385
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202529,137
November 202517,161
October 202524,390
September 202511,779
August 202513,715
July 202511,923
June 202519,704
May 202527,231
April 202533,398
March 202543,718
February 202536,867
January 202551,362
December 202447,430
November 202441,777
October 202425,669
September 202415,633
August 202415,997
July 202414,002
June 202431,333
May 202425,053
April 202432,204
March 202438,402
February 202431,535
January 202434,910

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Settlers Trail Wind Farm LLC plant?

Settlers Trail Wind Farm LLC made 0.2% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.3% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 79th largest of 602 plants in Illinois, the 1,963rd largest of 14,327 in the U.S. and the 438th largest of 1,358 wind plants. By 2025 generation it is the 66th largest of 531 generating plants in the state.

Settlers Trail Wind Farm LLC within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)15052,5150.3%
Generation (MWh)320,385191,710,9150.2%
Wind capacity (MW)1508,4581.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Settlers Trail Wind Farm LLC plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
STWFOperatingOnshore Wind Turbine1502011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Settlers Trail Wind Farm LLC plant?

EIA lists no joint owners for Settlers Trail Wind Farm LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Settlers Trail Wind Farm LLC plant?

Settlers Trail Wind Farm LLC is in Sheldon, Iroquois County, Illinois, at 40.6944° N, 87.5708° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Settlers Trail Wind Farm LLC's 150 MW is 2% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Kelly Creek Wind ProjectFord184621,703
Pilot Hill Wind FarmKankakee175588,568
Moraine Sands Wind PowerMason171574,203
Settlers Trail Wind Farm LLCIroquois150320,385
Pioneer Trail Wind Farm, LLCIroquois150470,405
Camp Grove Wind FarmSTARK150406,115
White Oak Energy LLCMcLean150399,881

Source: EIA Forms EIA-860 and EIA-923, 2025.