Hydro power plant, Connecticut
Shepaug hydroelectric power plant, Connecticut
Shepaug is a 37.2 MW hydro power plant in New Haven County, Connecticut, operated by FirstLight Power Resources Services LLC, and it generated 93,324 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Connecticut, and its capacity factor sits at the 32nd percentile of U.S. hydro plants. By 2025 generation it ranks 3,469th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Shepaug plant run compared with other hydro plants?
The Shepaug plant had a capacity factor of 26% in 2025 on 41.5 MW of net summer capacity, the 32nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 94 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Shepaug | 26% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Shepaug plant generating more or less than last year?
Generation at Shepaug fell 20.0% from 2024 to 2025, from 116,629 MWh to 93,324 MWh.
| Period | MWh |
|---|---|
| 2024 | 116,629 |
| 2025 | 93,324 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 7,648 |
| November 2025 | 4,874 |
| October 2025 | 2,732 |
| September 2025 | 94 |
| August 2025 | 852 |
| July 2025 | 4,121 |
| June 2025 | 9,490 |
| May 2025 | 19,004 |
| April 2025 | 12,875 |
| March 2025 | 15,083 |
| February 2025 | 5,203 |
| January 2025 | 11,348 |
| December 2024 | 7,903 |
| November 2024 | 1,283 |
| October 2024 | 2,227 |
| September 2024 | 1,065 |
| August 2024 | 1,604 |
| July 2024 | 5,358 |
| June 2024 | 4,627 |
| May 2024 | 9,980 |
| April 2024 | 20,734 |
| March 2024 | 23,659 |
| February 2024 | 15,512 |
| January 2024 | 22,677 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Shepaug plant, and when do they retire?
1 operable generator totals 37.2 MW, with an average age of 70 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 1 | 37 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 37 | 1955 | n/a |
| 2 | Postponed indefinitely | Petroleum Liquids | 49 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Shepaug plant?
FirstLight Hydro Generating Company is the only joint owner reported for Shepaug, with 100.0%. FirstLight Power Resources Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Shepaug plant?
Shepaug is in Southbury, New Haven County, Connecticut, at 41.4484° N, 73.2953° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Connecticut are similar in size?
Connecticut has 13 operable hydro plants with 116 MW of capacity, and Shepaug's 37.2 MW is 32% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Shepaug | New Haven | 37 | 93,324 |
| Stevenson | Fairfield | 31 | 70,774 |
Source: EIA Forms EIA-860 and EIA-923, 2025.