Hydro power plant, Connecticut
Stevenson hydroelectric power plant, Connecticut
Stevenson is a 30.5 MW hydro power plant in Fairfield County, Connecticut, operated by FirstLight Power Resources Services LLC, and it generated 70,774 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Connecticut, and its capacity factor sits at the 38th percentile of U.S. hydro plants. By 2025 generation it ranks 3,748th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Stevenson plant run compared with other hydro plants?
The Stevenson plant had a capacity factor of 28% in 2025 on 28.9 MW of net summer capacity, the 38th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Stevenson | 28% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Stevenson plant generating more or less than last year?
Generation at Stevenson fell 26.1% from 2024 to 2025, from 95,790 MWh to 70,774 MWh.
| Period | MWh |
|---|---|
| 2024 | 95,790 |
| 2025 | 70,774 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 6,098 |
| November 2025 | 3,559 |
| October 2025 | 1,626 |
| September 2025 | 652 |
| August 2025 | 1,531 |
| July 2025 | 3,025 |
| June 2025 | 7,662 |
| May 2025 | 12,063 |
| April 2025 | 9,875 |
| March 2025 | 11,956 |
| February 2025 | 4,109 |
| January 2025 | 8,618 |
| December 2024 | 6,313 |
| November 2024 | 480 |
| October 2024 | 996 |
| September 2024 | 979 |
| August 2024 | 7,269 |
| July 2024 | 4,419 |
| June 2024 | 3,620 |
| May 2024 | 8,860 |
| April 2024 | 16,359 |
| March 2024 | 16,350 |
| February 2024 | 12,780 |
| January 2024 | 17,365 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Stevenson plant, and when do they retire?
4 operable generators total 30.5 MW, with an average age of 102 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1910s | 3 | 23 | 74% | none reported |
| 1930s | 1 | 8 | 26% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 8 | 1919 | n/a |
| 2 | Operating | Conventional Hydroelectric | 8 | 1919 | n/a |
| 3 | Operating | Conventional Hydroelectric | 8 | 1919 | n/a |
| 4 | Operating | Conventional Hydroelectric | 8 | 1936 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Stevenson plant?
FirstLight Hydro Generating Company is the only joint owner reported for Stevenson, with 100.0%. FirstLight Power Resources Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Stevenson plant?
Stevenson is in Monroe, Fairfield County, Connecticut, at 41.3833° N, 73.1714° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Connecticut are similar in size?
Connecticut has 13 operable hydro plants with 116 MW of capacity, and Stevenson's 30.5 MW is 26% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Shepaug | New Haven | 37 | 93,324 |
| Stevenson | Fairfield | 31 | 70,774 |