Sierra Solar Greenworks is a 20 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 41,194 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 72nd percentile of U.S. solar plants. By 2025 generation it ranks 4,324th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
26%Capacity factor, 2025, 72nd percentile, on 18 MW net summer
4,324thU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Sierra Solar Greenworks plant run compared with other solar plants?

The Sierra Solar Greenworks plant had a capacity factor of 26% in 2025 on 18 MW of net summer capacity, the 72nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sierra Solar Greenworks26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sierra Solar Greenworks plant generating more or less than last year?

Generation at Sierra Solar Greenworks rose 4.3% from 2024 to 2025, from 39,493 MWh to 41,194 MWh.

Net generation by period
PeriodMWh
202439,493
202541,194
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,560
November 20252,368
October 20253,494
September 20253,585
August 20253,913
July 20254,184
June 20253,930
May 20254,130
April 20253,864
March 20253,430
February 20252,818
January 20252,918
December 20242,573
November 20242,814
October 20243,368
September 20243,574
August 20243,832
July 20243,862
June 20243,589
May 20243,773
April 20243,739
March 20243,163
February 20242,538
January 20242,668

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Sierra Solar Greenworks plant?

Sierra Solar Greenworks made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,123rd largest of 7,223 solar plants. By 2025 generation it is the 510th largest of 1,608 generating plants in the state.

Sierra Solar Greenworks within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)41,194204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sierra Solar Greenworks plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SSG1OperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sierra Solar Greenworks plant?

EIA lists no joint owners for Sierra Solar Greenworks. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sierra Solar Greenworks plant?

Sierra Solar Greenworks is in Lancaster, Los Angeles County, California, at 34.7036° N, 118.3342° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Sierra Solar Greenworks' 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Shafter Solar LLCKern2041,184
Algonquin SKIC20 Solar LLCKern2040,509
Atwell Island West SolarTulare2051,891
Sierra Solar GreenworksLos Angeles2041,194
Adelanto Solar, LLCSan Bernardino2059,303
TA-Acacia, LLCLos Angeles2048,331
Alamo SolarSan Bernardino2049,343