Solar power plant, California
Alamo Solar power plant, California
Alamo Solar is a 20 MW solar power plant in San Bernardino County, California, operated by Onward Energy, and it generated 49,343 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 83rd percentile of U.S. solar plants. By 2025 generation it ranks 4,106th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Alamo Solar plant run compared with other solar plants?
The Alamo Solar plant had a capacity factor of 28% in 2025 on 20 MW of net summer capacity, the 83rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Alamo Solar | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Alamo Solar plant generating more or less than last year?
Generation at Alamo Solar rose 3.5% from 2024 to 2025, from 47,688 MWh to 49,343 MWh.
| Period | MWh |
|---|---|
| 2024 | 47,688 |
| 2025 | 49,343 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,406 |
| November 2025 | 2,435 |
| October 2025 | 3,659 |
| September 2025 | 4,378 |
| August 2025 | 4,312 |
| July 2025 | 5,908 |
| June 2025 | 5,818 |
| May 2025 | 5,788 |
| April 2025 | 5,320 |
| March 2025 | 4,524 |
| February 2025 | 2,211 |
| January 2025 | 2,584 |
| December 2024 | 1,722 |
| November 2024 | 2,317 |
| October 2024 | 3,390 |
| September 2024 | 4,082 |
| August 2024 | 5,226 |
| July 2024 | 4,956 |
| June 2024 | 5,848 |
| May 2024 | 5,873 |
| April 2024 | 4,805 |
| March 2024 | 3,971 |
| February 2024 | 2,903 |
| January 2024 | 2,595 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Alamo Solar plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ALAMO | Operating | Solar Photovoltaic | 20 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Alamo Solar plant?
EIA lists no joint owners for Alamo Solar. Onward Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Alamo Solar plant?
Alamo Solar is in Oro Grande, San Bernardino County, California, at 34.6822° N, 117.3475° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Alamo Solar's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sierra Solar Greenworks | Los Angeles | 20 | 41,194 |
| Adelanto Solar, LLC | San Bernardino | 20 | 59,303 |
| TA-Acacia, LLC | Los Angeles | 20 | 48,331 |
| Alamo Solar | San Bernardino | 20 | 49,343 |
| Giffen Solar Park | Fresno | 20 | 19,635 |
| Blackwell Solar Park | Kern | 20 | 39,004 |
| Solar Oasis LLC | Los Angeles | 20 | 52,725 |
Source: EIA Forms EIA-860 and EIA-923, 2025.