Solar Oasis LLC power plant, California

Solar Oasis LLC is a 20 MW solar power plant in Los Angeles County, California, operated by Solar Oasis, LLC, and it generated 52,725 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 91st percentile of U.S. solar plants. By 2025 generation it ranks 4,032nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
30%Capacity factor, 2025, 91st percentile, on 20 MW net summer
4,032ndU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the Solar Oasis LLC plant run compared with other solar plants?

The Solar Oasis LLC plant had a capacity factor of 30% in 2025 on 20 MW of net summer capacity, the 91st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Solar Oasis LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Solar Oasis LLC plant generating more or less than last year?

Generation at Solar Oasis LLC rose 2.8% from 2024 to 2025, from 51,274 MWh to 52,725 MWh.

Net generation by period
PeriodMWh
202451,274
202552,725
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,347
November 20252,473
October 20253,807
September 20254,063
August 20255,457
July 20256,249
June 20255,835
May 20255,697
April 20255,503
March 20254,477
February 20253,546
January 20253,271
December 20242,656
November 20243,035
October 20243,962
September 20244,766
August 20245,552
July 20245,130
June 20245,577
May 20246,027
April 20245,288
March 20244,089
February 20242,689
January 20242,503

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Solar Oasis LLC plant?

Solar Oasis LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,133rd largest of 7,223 solar plants. By 2025 generation it is the 436th largest of 1,608 generating plants in the state.

Solar Oasis LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)52,725204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Solar Oasis LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OASISOperatingSolar Photovoltaic202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Solar Oasis LLC plant?

EIA lists no joint owners for Solar Oasis LLC. Solar Oasis, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Solar Oasis LLC plant?

Solar Oasis LLC is in Palmdale, Los Angeles County, California, at 34.6489° N, 118.0767° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Solar Oasis LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Alamo SolarSan Bernardino2049,343
Giffen Solar ParkFresno2019,635
Blackwell Solar ParkKern2039,004
Solar Oasis LLCLos Angeles2052,725
Vega SolarMerced2049,280
Nicolis Solar PV PlantTulare2046,346
Maricopa West Solar PV, LLCKern2050,290

Source: EIA Forms EIA-860 and EIA-923, 2025.