Skip to main content
RateWatt

Solar power plant, California

Maricopa West Solar PV, LLC power plant, California

Maricopa West Solar PV, LLC is a 20 MW solar power plant in Kern County, California, operated by Onward Energy, and it generated 50,290 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 86th percentile of U.S. solar plants. By 2025 generation it ranks 4,083rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
29%Capacity factor, 2025, 86th percentile, on 20 MW net summer
4,083rdU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Maricopa West Solar PV, LLC plant run compared with other solar plants?

The Maricopa West Solar PV, LLC plant had a capacity factor of 29% in 2025 on 20 MW of net summer capacity, the 86th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Maricopa West Solar PV, LLC29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Maricopa West Solar PV, LLC plant generating more or less than last year?

Generation at Maricopa West Solar PV, LLC rose 5.6% from 2024 to 2025, from 47,610 MWh to 50,290 MWh.

Net generation by period
PeriodMWh
202447,610
202550,290
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,089
November 20251,197
October 20253,633
September 20253,462
August 20255,703
July 20256,748
June 20256,239
May 20256,478
April 20255,107
March 20254,455
February 20253,125
January 20253,054
December 20241,085
November 20241,129
October 20243,585
September 20244,963
August 20245,739
July 20245,497
June 20246,472
May 20246,420
April 20244,224
March 20243,607
February 20242,497
January 20242,392

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Maricopa West Solar PV, LLC plant?

Maricopa West Solar PV, LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,138th largest of 7,223 solar plants. By 2025 generation it is the 453rd largest of 1,608 generating plants in the state.

Maricopa West Solar PV, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)50,290204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Maricopa West Solar PV, LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MWSOperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Maricopa West Solar PV, LLC plant?

EIA lists no joint owners for Maricopa West Solar PV, LLC. Onward Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Maricopa West Solar PV, LLC plant?

Maricopa West Solar PV, LLC is in Taft, Kern County, California, at 35.1153° N, 119.3178° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Maricopa West Solar PV, LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Solar Oasis LLCLos Angeles2052,725
Vega SolarMerced2049,280
Nicolis Solar PV PlantTulare2046,346
Maricopa West Solar PV, LLCKern2050,290
AP North Lake I, LPRiverside2045,684
Kettleman Solar -CentaurusKings2042,914
Coronal Lost HillsKern2035,431

Source: EIA Forms EIA-860 and EIA-923, 2025.