Solar power plant, California

AP North Lake I, LP solar power plant, California

AP North Lake I, LP is a 20 MW solar power plant in Riverside County, California, operated by AP North Lake I, LP, and it generated 45,684 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 84th percentile of U.S. solar plants. By 2025 generation it ranks 4,206th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
28%Capacity factor, 2025, 84th percentile, on 18.5 MW net summer
4,206thU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the AP North Lake I, LP plant run compared with other solar plants?

The AP North Lake I, LP plant had a capacity factor of 28% in 2025 on 18.5 MW of net summer capacity, the 84th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
AP North Lake I, LP28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the AP North Lake I, LP plant generating more or less than last year?

Generation at AP North Lake I, LP rose 15.2% from 2024 to 2025, from 39,644 MWh to 45,684 MWh.

Net generation by period
PeriodMWh
202439,644
202545,684
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,168
November 20252,425
October 20253,628
September 20253,886
August 20254,792
July 20255,657
June 20255,127
May 20254,749
April 20254,189
March 20253,637
February 20252,956
January 20252,470
December 20242,106
November 20242,534
October 20243,305
September 20243,300
August 20244,203
July 20244,616
June 20244,289
May 20244,460
April 20244,034
March 20242,920
February 20241,930
January 20241,947

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the AP North Lake I, LP plant?

AP North Lake I, LP made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,139th largest of 7,223 solar plants. By 2025 generation it is the 487th largest of 1,608 generating plants in the state.

AP North Lake I, LP within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)45,684204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the AP North Lake I, LP plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
APNLIOperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the AP North Lake I, LP plant?

EIA lists no joint owners for AP North Lake I, LP. AP North Lake I, LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the AP North Lake I, LP plant?

AP North Lake I, LP is in Hemet, Riverside County, California, at 33.7400° N, 117.0106° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and AP North Lake I, LP's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Vega SolarMerced2049,280
Nicolis Solar PV PlantTulare2046,346
Maricopa West Solar PV, LLCKern2050,290
AP North Lake I, LPRiverside2045,684
Kettleman Solar -CentaurusKings2042,914
Coronal Lost HillsKern2035,431
Imperial Valley Solar Co (IVSC) 2, LLCImperial2043,887

Source: EIA Forms EIA-860 and EIA-923, 2025.