Coronal Lost Hills solar power plant, California

Coronal Lost Hills is a 20 MW solar power plant in Kern County, California, operated by Arevon Energy, Inc., and it generated 35,431 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 27th percentile of U.S. solar plants. By 2025 generation it ranks 4,521st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
20%Capacity factor, 2025, 27th percentile, on 20 MW net summer
4,521stU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Coronal Lost Hills plant run compared with other solar plants?

The Coronal Lost Hills plant had a capacity factor of 20% in 2025 on 20 MW of net summer capacity, the 27th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 74 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Coronal Lost Hills20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Coronal Lost Hills plant generating more or less than last year?

Generation at Coronal Lost Hills fell 5.4% from 2024 to 2025, from 37,447 MWh to 35,431 MWh.

Net generation by period
PeriodMWh
202437,447
202535,431
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025316
November 20251,344
October 20253,836
September 202555
August 20250
July 20255,593
June 20255,593
May 20255,257
April 20254,529
March 20253,617
February 20252,764
January 20252,527
December 20241,629
November 20241,976
October 20242,481
September 20243,406
August 20244,031
July 20243,895
June 20244,754
May 20244,740
April 20244,270
March 20242,800
February 20241,979
January 20241,486

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Coronal Lost Hills plant?

Coronal Lost Hills made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,141st largest of 7,223 solar plants. By 2025 generation it is the 557th largest of 1,608 generating plants in the state.

Coronal Lost Hills within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)35,431204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Coronal Lost Hills plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CLHOperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Coronal Lost Hills plant?

EIA lists no joint owners for Coronal Lost Hills. Arevon Energy, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Coronal Lost Hills plant?

Coronal Lost Hills is in Lost Hills, Kern County, California, at 35.7267° N, 119.9058° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Coronal Lost Hills' 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Maricopa West Solar PV, LLCKern2050,290
AP North Lake I, LPRiverside2045,684
Kettleman Solar -CentaurusKings2042,914
Coronal Lost HillsKern2035,431
Imperial Valley Solar Co (IVSC) 2, LLCImperial2043,887
Seville 1Imperial2053,255
SEPV Mojave WestKern2052,657

Source: EIA Forms EIA-860 and EIA-923, 2025.