Wind power plant, Maine

Silver Maple wind power plant, Maine

Silver Maple is a 20 MW wind power plant in Penobscot County, Maine, operated by WEB Silver Maple Wind LLC, and it generated 63,882 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Maine, and its capacity factor sits at the 62nd percentile of U.S. wind plants. By 2025 generation it ranks 3,827th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
36%Capacity factor, 2025, 62nd percentile, on 20 MW net summer
0.4%Of ME generation, 2025
3 yearsAverage generator age, by MW

How hard does the Silver Maple plant run compared with other wind plants?

The Silver Maple plant had a capacity factor of 36% in 2025 on 20 MW of net summer capacity, the 62nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 133 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Silver Maple36%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Silver Maple plant generating more or less than last year?

Generation at Silver Maple rose 8.8% from 2024 to 2025, from 58,734 MWh to 63,882 MWh.

Net generation by period
PeriodMWh
202458,734
202563,882
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20258,203
November 20256,408
October 20254,994
September 20252,917
August 20252,881
July 20253,188
June 20253,871
May 20254,323
April 20256,008
March 20256,933
February 20256,054
January 20258,102
December 20246,189
November 20248,143
October 20245,665
September 20242,855
August 20242,331
July 20242,945
June 20242,815
May 20242,869
April 20245,928
March 20246,896
February 20246,611
January 20245,487

Source: EIA Form EIA-923, through August 2026.

How much of Maine's electricity comes from the Silver Maple plant?

Silver Maple made 0.4% of the 14,688,970 MWh reported by Maine plants in 2025, from 0.3% of the state's 6,164 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 44th largest of 274 plants in Maine, the 4,775th largest of 14,327 in the U.S. and the 1,034th largest of 1,358 wind plants. By 2025 generation it is the 39th largest of 242 generating plants in the state.

Silver Maple within Maine, 2025
MeasureThis plantMaineShare
Capacity (MW)206,1640.3%
Generation (MWh)63,88214,688,9700.4%
Wind capacity (MW)201,2171.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Silver Maple plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SIMA1OperatingOnshore Wind Turbine202022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Silver Maple plant?

EIA lists no joint owners for Silver Maple. WEB Silver Maple Wind LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Silver Maple plant?

Silver Maple is in Clifton, Penobscot County, Maine, at 44.7821° N, 68.5201° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Maine are similar in size?

Maine has 22 operable wind plants with 1,217 MW of capacity, and Silver Maple's 20 MW is 2% of that.

Wind plants in Maine around this size
PlantCountyMW2025 MWh
Stetson Wind IIWashington2655,303
Canton Mountain WindOxford2356,392
Spruce Mountain WIndOxford2052,563
Silver MaplePenobscot2063,882
RoxWindOxford1544,090

Source: EIA Forms EIA-860 and EIA-923, 2025.