Silver Palm solar power plant, Florida

Silver Palm is a 74.5 MW solar power plant in Palm Beach County, Florida, operated by Florida Power & Light Co, and it generated 155,337 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 56th percentile of U.S. solar plants. By 2025 generation it ranks 2,849th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
24%Capacity factor, 2025, 56th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Silver Palm plant run compared with other solar plants?

The Silver Palm plant had a capacity factor of 24% in 2025 on 74.5 MW of net summer capacity, the 56th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Silver Palm24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Silver Palm plant generating more or less than last year?

Generation at Silver Palm fell 0.5% from 2024 to 2025, from 156,075 MWh to 155,337 MWh. Through August 2026 it is running 0.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024156,075
2025155,337
2026 through August114,090
2025, same months113,063
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,616
July 202616,444
June 202615,719
May 202616,405
April 202615,988
March 202614,738
February 202611,675
January 20268,505
December 20259,815
November 202510,289
October 202511,609
September 202510,561
August 202514,128
July 202514,865
June 202514,969
May 202516,770
April 202516,512
March 202515,115
February 202511,728
January 20258,976
December 20249,676
November 202410,046
October 202410,308
September 202412,805
August 202413,734
July 202416,011
June 202414,427
May 202419,836
April 202418,885
March 202414,056
February 202412,108
January 20244,183

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Silver Palm plant?

Silver Palm made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 712th largest of 7,223 solar plants. By 2025 generation it is the 143rd largest of 313 generating plants in the state.

Silver Palm within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)155,337267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Silver Palm plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Silver Palm plant?

EIA lists no joint owners for Silver Palm. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Silver Palm, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Silver Palm plant?

Silver Palm is in TBD, Palm Beach County, Florida, at 26.7877° N, 80.3519° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Silver Palm's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
BeautyberryHendry75182,811
WoodyardHendry75177,619
IbisBrevard75132,837
Silver PalmPalm Beach75155,337
Pecan TreeWalton75160,891
Terrill CreekClay75162,532
Tenmile CreekCalhoun75182,057