Solar power plant, Florida

Terrill Creek solar power plant, Florida

Terrill Creek is a 74.5 MW solar power plant in Clay County, Florida, operated by Florida Power & Light Co, and it generated 162,532 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 2,788th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
25%Capacity factor, 2025, 64th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Terrill Creek plant run compared with other solar plants?

The Terrill Creek plant had a capacity factor of 25% in 2025 on 74.5 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Terrill Creek25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Terrill Creek plant generating more or less than last year?

Terrill Creek generated 162,532 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.8% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024158,803
2025162,532
2026 through August116,855
2025, same months115,885
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,658
July 202616,396
June 202616,814
May 202616,437
April 202616,274
March 202615,375
February 202611,233
January 20269,668
December 20258,459
November 202512,043
October 202512,179
September 202513,966
August 202512,970
July 202514,618
June 202515,791
May 202517,826
April 202519,015
March 202514,665
February 202510,849
January 202510,151
December 20249,201
November 202410,782
October 202412,640
September 202411,308
August 202416,015
July 202415,081
June 202418,183
May 202419,131
April 202419,104
March 202414,250
February 202413,108
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Terrill Creek plant?

Terrill Creek made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 714th largest of 7,223 solar plants. By 2025 generation it is the 130th largest of 313 generating plants in the state.

Terrill Creek within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)162,532267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Terrill Creek plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Terrill Creek plant?

EIA lists no joint owners for Terrill Creek. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Terrill Creek, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Terrill Creek plant?

Terrill Creek is in Green Cove Springs, Clay County, Florida, at 29.8814° N, 81.7626° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Terrill Creek's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
IbisBrevard75132,837
Silver PalmPalm Beach75155,337
Pecan TreeWalton75160,891
Terrill CreekClay75162,532
Tenmile CreekCalhoun75182,057
KayakOkaloosa75181,244
Long CreekManatee75178,944

Source: EIA Forms EIA-860 and EIA-923, 2025.