Solar power plant, South Carolina
SR Lambert I, LLC solar power plant, South Carolina
SR Lambert I, LLC is a 100 MW solar power plant in Georgetown County, South Carolina, operated by SR Lambert I, LLC, and it generated 10,624 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. solar plants. By 2025 generation it ranks 6,006th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the SR Lambert I, LLC plant run compared with other solar plants?
The SR Lambert I, LLC plant had a capacity factor of 1% in 2025 on 100 MW of net summer capacity, the 2nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 4 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| SR Lambert I, LLC | 1% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the SR Lambert I, LLC plant generating more or less than last year?
SR Lambert I, LLC generated 10,624 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 10,624 |
| 2026 through August | 163,682 |
Monthly generation, Dec 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,462 |
| July 2026 | 23,969 |
| June 2026 | 25,001 |
| May 2026 | 23,361 |
| April 2026 | 24,355 |
| March 2026 | 21,411 |
| February 2026 | 13,170 |
| January 2026 | 12,953 |
| December 2025 | 10,624 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the SR Lambert I, LLC plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LAMB1 | Operating | Solar Photovoltaic | 100 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the SR Lambert I, LLC plant?
EIA lists no joint owners for SR Lambert I, LLC. SR Lambert I, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the SR Lambert I, LLC plant?
SR Lambert I, LLC is in Georgetown, Georgetown County, South Carolina, at 33.3330° N, 79.5635° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in South Carolina are similar in size?
South Carolina has 126 operable solar plants with 1,956 MW of capacity, and SR Lambert I, LLC's 100 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| SR Lambert I, LLC | Georgetown | 100 | 10,624 |
| SR Lambert II | Georgetown | 100 | 10,743 |
| Palmetto Plains | Orangeburg | 75 | 126,120 |
| TWE Bowman Solar Project | Orangeburg | 75 | 143,815 |
Source: EIA Forms EIA-860 and EIA-923, 2025.