Solar power plant, South Carolina

TWE Bowman Solar Project, South Carolina

TWE Bowman Solar Project is a 75 MW solar power plant in Orangeburg County, South Carolina, operated by SunStrong Management, and it generated 143,815 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in South Carolina, and its capacity factor sits at the 45th percentile of U.S. solar plants. By 2025 generation it ranks 2,968th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
22%Capacity factor, 2025, 45th percentile, on 73.1 MW net summer
0.1%Of SC generation, 2025
5 yearsAverage generator age, by MW

How hard does the TWE Bowman Solar Project plant run compared with other solar plants?

The TWE Bowman Solar Project plant had a capacity factor of 22% in 2025 on 73.1 MW of net summer capacity, the 45th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
TWE Bowman Solar Project22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the TWE Bowman Solar Project plant generating more or less than last year?

Generation at TWE Bowman Solar Project rose 18.2% from 2024 to 2025, from 121,625 MWh to 143,815 MWh. Through August 2026 it is running 13.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024121,625
2025143,815
2026 through August89,205
2025, same months103,307
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,876
July 202613,633
June 202612,266
May 202610,996
April 202614,732
March 202612,746
February 20267,443
January 20266,513
December 20256,071
November 202510,144
October 202510,722
September 202513,571
August 202510,925
July 202515,804
June 202516,816
May 202514,386
April 202516,530
March 202513,198
February 20258,045
January 20257,603
December 20245,557
November 20247,817
October 202411,126
September 20249,433
August 202411,616
July 202412,645
June 202414,830
May 202412,978
April 202412,905
March 20249,935
February 20246,913
January 20245,870

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the TWE Bowman Solar Project plant?

TWE Bowman Solar Project made 0.1% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 0.3% of the state's 27,220 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 40th largest of 215 plants in South Carolina, the 3,097th largest of 14,327 in the U.S. and the 584th largest of 7,223 solar plants. By 2025 generation it is the 36th largest of 197 generating plants in the state.

TWE Bowman Solar Project within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)7527,2200.3%
Generation (MWh)143,815103,930,5300.1%
Solar capacity (MW)751,9563.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the TWE Bowman Solar Project plant, and when do they retire?

1 operable generator totals 75 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BOWOperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the TWE Bowman Solar Project plant?

EIA lists no joint owners for TWE Bowman Solar Project. SunStrong Management operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the TWE Bowman Solar Project plant?

TWE Bowman Solar Project is in Bowman, Orangeburg County, South Carolina, at 33.3162° N, 80.6824° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in South Carolina are similar in size?

South Carolina has 126 operable solar plants with 1,956 MW of capacity, and TWE Bowman Solar Project's 75 MW is 4% of that.

Solar plants in South Carolina around this size
PlantCountyMW2025 MWh
SR Lambert I, LLCGeorgetown10010,624
SR Lambert IIGeorgetown10010,743
Palmetto PlainsOrangeburg75126,120
TWE Bowman Solar ProjectOrangeburg75143,815
HuntleyOrangeburg75157,719
Allora Solar, LLCLexington75154,008
Centerfield Cooper Solar, LLCChesterfield75139,570