Sundance Renewable Energy Center, Florida

Sundance Renewable Energy Center is a 74.9 MW solar power plant in Madison County, Florida, operated by Duke Energy Florida, LLC, and it generated 88,149 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 3,541st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
13%Capacity factor, 2025, 10th percentile, on 74.9 MW net summer
3,541stU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Sundance Renewable Energy Center plant run compared with other solar plants?

The Sundance Renewable Energy Center plant had a capacity factor of 13% in 2025 on 74.9 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 49 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sundance Renewable Energy Center13%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sundance Renewable Energy Center plant generating more or less than last year?

Sundance Renewable Energy Center generated 88,149 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 284.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
202588,149
2026 through August124,491
2025, same months32,412
Monthly generation, Jul 2025 to Aug 2026
MonthMWh
August 202617,808
July 202615,703
June 202616,712
May 202616,552
April 202618,295
March 202616,471
February 202612,253
January 202610,697
December 202510,001
November 202513,668
October 202514,426
September 202517,642
August 202515,152
July 202517,260

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Sundance Renewable Energy Center plant?

Sundance Renewable Energy Center made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 619th largest of 7,223 solar plants. By 2025 generation it is the 227th largest of 313 generating plants in the state.

Sundance Renewable Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)88,149267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sundance Renewable Energy Center plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
68049OperatingSolar Photovoltaic752025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sundance Renewable Energy Center plant?

EIA lists no joint owners for Sundance Renewable Energy Center. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Sundance Renewable Energy Center, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Sundance Renewable Energy Center plant?

Sundance Renewable Energy Center is in Lee, Madison County, Florida, at 30.2668° N, 83.2955° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Sundance Renewable Energy Center's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Winquepin Renewable Energy CenterMadison75171,517
Falmouth Renewable Energy CenterSuwannee75180,960
County Line Renewable Energy CenterGilchrist75186,587
Sundance Renewable Energy CenterMadison7588,149
Rattler Solar PlantHernando7522,684
Half Moon Solar PlantSumter7523,687
Wimauma Solar and Battery StorageHillsborough75108,115

Source: EIA Forms EIA-860 and EIA-923, 2025.