Natural gas power plant, Texas

Tenaska Gateway Generating Station, Texas

Tenaska Gateway Generating Station is a 940 MW natural gas power plant in Rusk County, Texas, operated by Tenaska Gateway Partners Ltd, and it generated 4,708,795 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Texas, and its capacity factor sits at the 82nd percentile of U.S. natural gas plants. By 2025 generation it ranks 239th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

940 MWNameplate capacity
65%Capacity factor, 2025, 82nd percentile, on 826 MW net summer
0.8%Of TX generation, 2025
24 yearsAverage generator age, by MW

How hard does Tenaska Gateway Generating Station run compared with other natural gas plants?

Tenaska Gateway Generating Station had a capacity factor of 65% in 2025 on 826 MW of net summer capacity, the 82nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 238 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tenaska Gateway Generating Station65%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Tenaska Gateway Generating Station generating more or less than last year?

Tenaska Gateway Generating Station generated 4,708,795 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.7% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20241,512,902
20254,708,795
2026 through August2,786,775
2025, same months3,154,263
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026545,051
July 2026539,182
June 2026453,808
May 2026316,588
April 2026328,346
March 202629,503
February 2026222,900
January 2026351,397
December 2025354,026
November 2025436,384
October 2025275,018
September 2025489,104
August 2025530,668
July 2025537,349
June 2025506,290
May 2025503,049
April 2025275,993
March 202594,738
February 2025293,311
January 2025412,865
December 2024321,734
November 2024122,275
October 202455,927
September 202431,764
August 2024137,833
July 202484,435
June 202443,215
May 202456,770
April 20240
March 20240
February 2024155,732
January 2024503,217

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from Tenaska Gateway Generating Station?

Tenaska Gateway Generating Station made 0.8% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.5% of the state's 195,966 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 37th largest of 1,023 plants in Texas, the 333rd largest of 14,327 in the U.S. and the 167th largest of 1,962 natural gas plants. By 2025 generation it is the 26th largest of 816 generating plants in the state.

Tenaska Gateway Generating Station within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)940195,9660.5%
Generation (MWh)4,708,795592,896,1760.8%
Natural gas capacity (MW)94081,5741.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Tenaska Gateway Generating Station, and when do they retire?

4 operable generators total 940 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s4940100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GTG1OperatingNatural Gas Fired Combined Cycle1832001n/a
GTG2OperatingNatural Gas Fired Combined Cycle1832001n/a
GTG3OperatingNatural Gas Fired Combined Cycle1832001n/a
STG1OperatingNatural Gas Fired Combined Cycle3902001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Tenaska Gateway Generating Station?

5 owners report shares in Tenaska Gateway Generating Station; Tenaska Rusk Partners, LP holds the largest named share, 59.4% or about 558 MW. Tenaska Gateway Partners Ltd operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Tenaska Rusk Partners, LP59.4%5582,797,024
Tenaska Gateway Investments, LLC39.6%3721,864,683
Tenaska VII Partners, LP0.8%737,199
TC Gateway GP, LLC0.2%28,476
Tyr Gateway GP, LLC0.0%01,413

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is Tenaska Gateway Generating Station?

Tenaska Gateway Generating Station is in Mt. Enterprise, Rusk County, Texas, at 32.0178° N, 94.6197° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Tenaska Gateway Generating Station's 940 MW is 1% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Montgomery CountyMontgomery1,0005,870,260
Hays Energy ProjectHays9895,338,430
Tenaska Frontier Generation StationGrimes9403,503,759
Tenaska Gateway Generating StationRusk9404,708,795
Formosa Utility Venture LtdCalhoun9334,865,486
Baytown Energy CenterChambers9333,746,903
Lake HubbardDallas9281,858,485

Source: EIA Forms EIA-860 and EIA-923, 2025.